My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso23-06 PC Reso Reso 0028 Approving 1201 Main with Conditions of Approval 04.18.2023
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
Reso23-06 PC Reso Reso 0028 Approving 1201 Main with Conditions of Approval 04.18.2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 3:18:27 PM
Creation date
6/22/2023 3:17:34 PM
Metadata
Fields
Template:
Atty
doc type
Resolution
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
6/22/2023 3:18 PM
Modified:
6/22/2023 3:18 PM
Text:
http://www.seq.org/+uploaded/file_1677.pdf
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
6/22/2023 3:18 PM
Modified:
6/22/2023 3:18 PM
Text:
http://www.seq.org/+uploaded/file_1677.pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0028/PC RESO APPROVING 1201 MAIN WITH CONDITIONS OF APPROVAL <br />REV: 04-18-23 VR <br />Page 18 of 34 <br />15. School Impact Fee – For residential additions greater than 500 square feet and <br />new commercial or industrial construction, pay a School Impact Fee to the Sequoia <br />Union High School District. Information regarding this fee may be obtained by <br />contacting the Sequoia Union High School District at (650) 369-1411. <br />[SDR][SCHOOL DISTRICT] <br /> <br />16. Notice of Fees Protest – The applicant may protest any fees, dedications, <br />reservations, or other exactions imposed by the City as part of the approval or as a <br />condition of approval of this development. Per California Government Code Section <br />66020, this 90-day protest period has begun as of the date of the approval of this <br />application. [SDR][OFFICE OF THE CITY ATTORNEY] <br />FEMA and Base Flood Elevations <br />17. Finished Floor Elevation (FFE) - The lowest finished floor elevation (FFE) is shown <br />to be 9.7 feet, based on NAVD88. FEMA has notified all the municipalities within <br />San Mateo County that new Flood Insurance Rate Maps (FIRMs) will become <br />effective on April 5, 2019. The project site is currently located within Zone X and is <br />not within a Special Flood Hazard Area. Upon FEMA’s approval of the new maps, <br />the project will be located within Zone AE, with a base flood elevation of 10 feet, and <br />will be within a Special Flood Hazard Area. Chapter 41 of the City’s municipal code <br />and engineering standards require that new construction and substantial <br />improvements to existing structures be built with the lowest finished floor elevation <br />set at or above the base flood elevation, with a recommendation of setting the lowest <br />finished floor elevation 1 foot above the base flood elevation. Chapter 41 of the <br />City’s municipal code requires that all building permits and project plans meet <br />the requirements of the FIRM in effect at the time of permit issuance, <br />regardless of when the project was submitted or deemed <br />complete. [SDR][ENGINEERING] <br /> <br />18. Elevation Certificate – If all or a portion of the site is within a Special Flood Hazard <br />Area (as shown on the latest FEMA Flood Insurance Rate Maps in effect at building <br />permit issuance), upon completion of the structure, the elevation of the lowest floor <br />(including basement when applicable) shall be certified by a registered professional <br />engineer or land surveyor, verified by the City’s Building Inspector to be properly <br />elevated, and provided to the Floodplain Administrator. Where required by Chapter <br />41 of the City’s Municipal Code, the applicant shall also submit certification by a <br />registered professional engineer or architect that the standards for elevation and <br />floodproofing have been satisfied. [SDR][ENGINEERING] <br /> <br />Fire Department <br /> <br />19. Construction Permits – Individual building and fire code permit reviews will be <br />required on all demolitions, remodels, tenant improvements, and new construction <br />in accordance with the legally adopted codes and standards in place at the time of <br />permit application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.