Laserfiche WebLink
REV: 11-07-23 SK <br />Consultant and their team will prepare a comment checklist that <br />includes preliminary responses and proposed revisions to address <br />each comment that will be completed as part of the 100% Final Design <br />submittal. <br />Consultant will schedule and conduct a City Meeting as described <br />and budgeted under Task 1. <br />City staff will review the comment checklist and confirm proposed <br />revisions are acceptable. <br />Deliverables for task 7: Electronic copy of 90% Plans (24”x36” size), Electronic copy of <br />90% Specifications (Word and PDF), Electronic copy of 90% Engineer’s Estimate (PDF), <br />Electronic copy of Structural Calculations (PDF), Electronic copy of 60% Comment <br />checklist with responses (PDF), Electronic copy of Revised BOD (PDF), and 90% <br />Submittal Comment Checklist (PDF). <br />TASK 8: 100% FINAL DESIGN SUBMITTAL <br />Subtask 8.1 – SCADA Strategy and Programming Report <br />The subconsultant, DTN Engineers, Inc., will revise the SCADA Strategy <br />and Programming Report based on feedback from the City. DTN will coordinate <br />Contractor’s testing requirements of the SCADA/PLC program with the City. <br />SCADA/PLC programming may be provided as an optional service. <br />Subtask 8.2 – 100% Construction Documents <br />Consultant’s team will progress the 90% Semi-Final Design Documents to <br />the 100% level. Consultant and team will once again refine the BOD prepared <br />under Task 4 and updated under Task 7. There are no anticipated updates to <br />the structural calculations for this submittal. Consultant and team will revise the <br />documents to address comments from the 90% Submittal. <br />Subtask 8.3 – Submittals and Plan Reviews <br />Consultant will prepare the 100% Final Design Submittal to the City. The <br />City will circulate the 100% submittal to all applicable departments such as <br />Building Inspection, Engineering & Construction, Planning & Housing, the Fire <br />Department, etc. The 100 submittal and plan review process will include the <br />following tasks: <br />City will review the 100% submittal documents and confirm all <br />comments have been addressed and there are no new comments. The <br />schedule has allocated a 4-week review period for this task. <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 26 of 54)