My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 BKF Engineers Price Tract Pump Station
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 BKF Engineers Price Tract Pump Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:08:47 PM
Creation date
12/18/2023 2:07:26 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Price Pump Station Design
RMP File Number
304
Date
12/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REV: 11-07-23 SK <br />detailed assessment and analysis of the boundary lines. While performing the <br />field work associated with the topography, Consultant will conduct field <br />research for primary monumentation to establish boundary resolution. Once <br />the research and reconnaissance has been completed, Consultant will perform <br />a boundary determination, which includes an analysis of the assembled <br />evidence with respect to its relationship to the title and other documentary <br />evidence. The requirement for a Record of Survey is not known but is assumed <br />to be required. However, Consultant assumes that either sufficient existing <br />monumentation is not recovered, a material discrepancy is discovered, or any <br />other provisions requiring a Record of Survey as stated in Section 8762 of the <br />Professional Land Surveyors Act of the State of California are encountered. <br />Consultant will prepare a Record of Survey to fulfill their legal and professional <br />obligation. Consultant proposes a Time and Materials (T&M) clause to <br />accommodate any additional efforts, time, or resources that may be required <br />based on the initial findings. This clause ensures that the scope and cost of the <br />services provided by Consultant remain aligned with the actual requirements, <br />providing transparency and fairness to the City and the Consultant. <br />Optional Task 5 – GREEN INFRASTRUCTURE DESIGN <br />• Conceptual BMP Layout <br />• Concurrent with Task 4 described, Consultant and sub-consultant, <br />Callander Associates Landscape Architecture, Inc. (CALA), will perform <br />conceptual stormwater treatment Best Management Practices (BMP) <br />sizing calculations and develop a preliminary BMP layout for each pump <br />station alternative to satisfy Provision C.3 of the Municipal Regional <br />Permit (MRP). Given the location and size of the stormwater treatment <br />area is not yet defined, this proposal assumes that one contiguous, lined <br />bioretention planter BMP will be utilized to treat stormwater runoff from <br />the site and the BMP will be in the immediate vicinity of the <br />improvements. Off-site treatment is not anticipated. The BMP will be fed <br />by gravity flow alone and stormwater treatment will not require pumping. <br />Consultant and subconsultant do not anticipate structural engineering <br />will be required for the edge condition, and hydromodification controls <br />are not anticipated to be required. Consultant and subconsultant will <br />prepare narrative text to be included in the Alternatives Analysis and <br />Basis of Design Report (BOD) that documents the BMP sizing <br />calculations and preliminary layout. <br />• 60% BMP Design: Consultant and CALA will refine the stormwater <br />treatment BMP sizing calculations and progress the BMP design to the <br />60% level of completion. Consultant and CALA will add BMP-related <br />information to the plans, specifications and cost estimates that are <br />described under Task 6. Anticipated elements include the BMP soil <br />layers, underdrain, cleanout, overflow structure, liner attachments, edge <br />condition, irrigation point of connection, irrigation equipment palette and <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 31 of 68)
The URL can be used to link to this page
Your browser does not support the video tag.