<br />REV: 11-07-23 SK <br />plant palette. In addition, Consultant and subconsultant will prepare a <br />Stormwater Management Plan (SMP) exhibit identifying the drainage <br />management area and the proposed BMP location and will complete the <br />County’s C.3 and C.6 Development Review Checklist. Consultant will <br />incorporate the 60% BMP design into the 60% Initial Design Submittal <br />for the City, provide responses to City comments, and revise and <br />resubmit the 60% Initial Design submittal as described under Task 6. <br />• 90% BMP Design: Consultant and CALA will progress the 60% BMP <br />Design to the 90% level. Consultant and subconsultant will formalize all <br />BMP sizing calculations. Consultant will refine the plans, specifications <br />and cost estimate, and formalize the County’s C.3 and C.6 Development <br />Review Checklist. Consultant will incorporate the 90% BMP design <br />documents into the 90% Semi-Final Design Submittal for the City and <br />respond to comments as described under Task 7. <br />• 100% BMP Design: Consultant and subconsultant, CALA, will <br />progress the 90% BMP Design to the 100% level. Consultant will <br />incorporate the 100% BMP design documents into the 100% Final <br />Design Submittal to the City. <br />• BMP Construction: Consultant and subconsultant, CALA, will be <br />available during the bidding phase and construction phase as described <br />under Task 9 to assist with BMP-related items. Budget has been <br />included to respond to bidder questions and RFIs during bidding phase, <br />prepare addenda as warranted, and assist the design team in <br />responding to construction RFIs and submittals. <br />Optional Task 6 – PLC/SCADA PROGRAMMING <br />• Subconsultant, DTN, will provide PLC/SCADA programming and provide <br />startup assistance during construction. DTN will be assisted by EDCCO Group, <br />who will serve as a subcontractor to DTN. SCADA/PLC/OIT programming <br />standards will follow the City’s standards established by the EDCCO Group. <br />PLC hardware is to be the responsibility of others, and all hardware will be <br />furnished by others. A factory test is included and assumes the PLC hardware <br />is readily available from others for the test. The factory test may be witnessed <br />by the City. Field startup assistance includes two days from EDCCO working <br />with the Contractor in the field. Operational testing and alarm tests, etc. will also <br />be performed by EDCCO Group with DTN’s involvement as a coordinator / <br />facilitator. The System SCADA/PLC programming documentation shall be per <br />current standard practice and consistent with previous projects EDCCO Group <br />has completed with the City. <br />Optional Task 8: ADDITIONAL BORING <br />• If the condition assessment of the existing outfall or the hydraulic modeling <br />of the outfall pipe shows that the outfall requires replacement, then an <br />additional boring is required near the outfall location. For this optional task, <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 32 of 68)