My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 BKF Engineers Price Tract Pump Station
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 BKF Engineers Price Tract Pump Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:08:47 PM
Creation date
12/18/2023 2:07:26 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Price Pump Station Design
RMP File Number
304
Date
12/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REV: 11-07-23 SK <br />BAGG will perform an additional boring closer to the outfall. Consultant <br />assumes that the boring will not be performed on the creek or jurisdictional <br />area. <br />Optional Task 9: CEQA/NEPA & PERMITTING <br />• As an optional task, Consultant will perform the following CEQA, NEPA and <br />Permitting tasks that will likely be required if the outfall of the project is <br />impacted. The specifics of this scope will depend on the actual project <br />improvements, so this scope is intended to be refined prior to starting any of <br />the work described in this optional task. The following materials will be available <br />prior to starting this task: <br />• Approximately 30% design drawings on which to base the CEQA <br />analysis and modeling, including necessary technical information to <br />support the analysis of all CEQA and NEPA topics. Basing the CEQA <br />project description on 30% approved design drawings ensures the <br />CEQA and NEPA documents will be based on a stable project that won’t <br />change substantially. <br />• Project narrative explaining the project features, proposed <br />construction activities and equipment as well as a summary of <br />construction phasing and duration: to be prepared by Consultant and <br />subconsultant. <br />• Geotechnical Report: to be performed and prepared by consultant <br />and subconsultant. <br />• Phase I/II Environmental Site Assessment: to be performed and <br />prepared by consultant and subconsultant. <br />• The scope of work described in this optional task is based on the following <br />assumptions: <br />• Project Changes: The work scope does not cover new or revised <br />analysis needed to address substantial changes to project design or <br />variables made during design development after the start of work, such <br />as changes in the project footprint/ limits of disturbance, construction <br />methods, etc. <br />• Air Quality and Noise Modeling. The budget does not include air <br />quality modeling or ambient noise modeling. <br />• AB 52 Tribal Consultation. This work scope does not include tribal <br />consultation under AB 52; however, if necessary, Basin can assist the <br />City with this process, under a supplemental scope and budget. <br />• Administrative Drafts. The cost estimate assumes there will be only <br />one round of administrative review of each of the work products prior to <br />finalization of the documentation. If more administrative drafts are <br />required, the cost of additional consultants’ time and materials will be <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 33 of 68)
The URL can be used to link to this page
Your browser does not support the video tag.