Laserfiche WebLink
REV: 02-16-24 SK <br />o Structural Sections and Details of new rectangular hydraulic concrete <br />channel that matches existing in-situ dimensions. <br />•Hydraulic analyses are not included in this proposal as it is assumed that a design <br />that does not reduce the cross-sectional area of the channel can be developed. If <br />constraints require a design that does reduce the area, then hydraulic analyses <br />will have to be conducted. <br />•Deliverables: Consultant will prepare the 90% Design Submittal documents and <br />will present one digital set of the design drawings, technical specifications, draft <br />supporting structural calculation, draft bid tabulation, and Engineer’s opinion of <br />probable construction cost to the City for review. <br />100% Design <br />•Consultant will develop a 100% design that will address City’s outstanding <br />comments on the 90% Submittal and prepare the construction documents for final <br />bidding. The close-out of all City comments received on previous submittals will be <br />required for completing the 100-percent design. <br />•Consultant will develop the 100-percent cost estimate, and it will be presented in <br />the format of the bid schedule, for preparation of Engineer’s opinion of probable <br />cost. The final engineering calculations shall also include any miscellaneous <br />technical data, maintenance considerations and catalogue cuts for any special <br />equipment. Consultant will prepare the corresponding Structural engineering <br />calculations in support of all final design submittals. <br />•The 100% design will address any comments from the permitting agencies <br />requirements such as Department of Fish and Wildlife, U.S. Army Corps of <br />Engineers, and Water Boards. <br />•Consultant will prepare the final construction documents for City to make available <br />to potential bidders. It is assumed that City will perform all reproduction or will <br />contract a local business for reproduction services, to make the document <br />available to potential bidders. <br />•Deliverables: Consultant will prepare the 100% Final Design Submittal documents <br />and will present on digital set of the design drawings, technical specifications, <br />supporting structural calculations, bid tabulation, and Engineer’s opinion of <br />probable construction cost to City for review. <br />Task 4 – Bid Support and Construction Services for $8,445 Time & Materials (T&M) <br />•Consultant will provide clarifications during the bid phase, attend the pre-bid <br />meeting, respond to questions from contractors, and issue addenda as directed by <br />City. <br />•Consultant will attend and conduct a pre-bid meeting and coordinate with City to <br />respond to up to five (5) requests for information (RFIs) or clarification during <br />bidding. <br />•Consultant will attend the pre-construction meeting and will conduct one (1) site <br />visit for the purpose of structural observation. The construction observation will <br />occur upon completion of steel reinforcement placement prior to concrete pouring. <br />ATTY/AGR.2024.016/Wood Rodgers, Inc. (1891 Palm Avenue Creek Wall Rehabilitation) (Page 13 of 17)