Laserfiche WebLink
2 <br /> <br />lengths, construct direct-connect flyover ramps between Veterans Boulevard and US 101, add <br />new sidewalks, and add Class I, II, IV bikeways. The project will embrace the Complete Streets <br />and Safe Systems approach to enhance non-vehicular mobility and safety, while incorpora�ng <br />efficient and effec�ve func�onal design to improve passenger vehicle and truck traffic <br />opera�ons necessary to reduce conges�on. <br /> <br />1.1. Rebranding of Project: 84/101 Interchange Reimagined <br />In fall 2023, the Project was rebranded to provide an updated message that highlights <br />alignment with regional priori�es for stakeholders and focused messaging for external <br />communica�ons. Slide decks containing detailed stakeholder engagement informa�on can be <br />found on SharePoint: Documents/09 Public Outreach/09.03 Presenta�ons/PowerPoint <br />Templates. <br />The 84/101 Interchange Reimagined creates solu�ons for current problems and reimagines the <br />interchange to meet the needs of all users. <br />Problem Solu�on <br />Highway safety and traffic <br />conges�on: between 1/1/2018 to <br />12/31/2022, there were 195 <br />collisions within the project <br />footprint: 1 fatal and 7 severe <br />injury crashes. <br />Provide opera�onal improvements that eliminates <br />hazardous backup queuing into 101 travel lanes <br />- by crea�ng the flyover ramps to/from Veterans Blvd. <br />- by replacing the 5-legged intersec�on with a more <br />efficient ramp configura�on. <br />- by installing safety countermeasures (traffic signals, <br />gates at crossings with signs, etc.) <br />Lack of bicycle and pedestrian <br />facili�es which prevents safe and <br />equitable access to regional <br />facili�es <br /> <br />- Construct new class I, II, and IV bike/ped facili�es <br />through the interchange. <br />- Correct two unsafe at-grade railroad crossings. <br />Conges�on-related delays - Improve freight access to and from the Port of <br />Redwood City. <br /> <br />The following is a link to collision data in the project area (can filter based on bike/ped or <br />vehicle-related accidents): <br />htps://experience.arcgis.com/experience/60241dd9e01d481f8311374b7279486f/page/Heat- <br />Maps/?views=Enjoy-Exploring%2CDUI-Related <br /> <br />1.1.1. Project Benefits: Improved Safety <br />Improvements will reduce the number of collisions per year by improving traffic flows <br />and reduc ing delays. Exis�ng crashes in the Project Area were analyzed using January <br />1st, 2018 through December 31st, 2022 data from the Transporta�on Injury Mapping