My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt24 CaltransUS101/SR84 Interchange Improvement Project
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2024
>
Agmt24 CaltransUS101/SR84 Interchange Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2024 12:33:09 PM
Creation date
7/26/2024 12:31:48 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
SMCTA PSE for US 101 Woodside Interchange
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/26/2024 12:33 PM
Modified:
7/26/2024 12:33 PM
Text:
https://www.redwoodcity.org/home/showpublisheddocument/1508/635727389085030000
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/26/2024 12:33 PM
Modified:
7/26/2024 12:33 PM
Text:
https://www.redwoodcity.org/home/showpublisheddocument/1510/635727389087700000
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/26/2024 12:33 PM
Modified:
7/26/2024 12:33 PM
Text:
https://www.redwoodcity.org/departments/community-development-department/engineering-transportation/transportation-parking/101-woodside-interchange.
ID:
4
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/26/2024 12:33 PM
Modified:
7/26/2024 12:33 PM
Text:
https://www.redwoodcity.org/departments/community-development-department/engineering-transportation/transportation-parking/101-woodside-interchange.
ID:
5
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/26/2024 12:33 PM
Modified:
7/26/2024 12:33 PM
Text:
https://www.redwoodcity.org/departments/community-development-department/engineering-transportation/transportation-parking/101-woodside-interchange.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6 <br /> <br />Project Milestones <br />• Appraisal mapping was approved by Caltrans in 2021, and the Project con�nues <br />to work in the right-of-way (ROW) phase. <br />• The Plans, Specifica�ons, and Es�mates (PS&E/ROW) support phase brought <br />the construc�on designs to a 95% Level of Comple�on in 2017. <br />• The Project completed the Project Approval and Environmental Document <br />(PA&ED) phase in 2016, mee�ng both State CEQA and Federal NEPA <br />requirements. (Link to ND/FONSI.) <br />• In 2012, the City assumed the role of Project Sponsor. <br />• Caltrans approved the Project Study Report (PSR) in 2000, and a Supplemental <br />PSR (Link) in 2006. <br />A regularly updated project schedule can be found on the City’s Project website: <br />htps://www.redwoodcity.org/departments/community-development- <br />department/engineering-transporta�on/transporta�on-parking/101-woodside- <br />interchange <br />1.3. Project Outreach and Communication <br />The Project has conducted multiple outreach efforts in recent phases. A summary of previous <br />communications and outreach efforts can be found in Appendix A. The third and current phase <br />of the project involves right-of-way procurement, finalizing the design plans, and securing the <br />funding for the construction phase which requires coordinated communication. <br /> <br />1.3.1. Right-of-Way Funding and Final Design <br />The City will purchase property from 23 owners. These purchases include permanent <br />acquisi�ons as well as temporary construc�on easements. There is no residen�al <br />property needed for the project. The right-of-way process is expected to take 18-24 <br />months, star�ng in late summer 2023. As described below, the Consultant Right-of-Way <br />Lead will manage all property owner discussions and contacts. The Consultant Project <br />Manager will direct that work and connect with the City’s Project Manager and Public <br />Informa�on Officer related to the messaging and media contacts. A Right-of-Way <br />Communica�ons Plan (Atachment C) outlines the plan and responsibili�es. The <br />Consultant Communica�ons Team will be u�lized on an as-needed basis only. <br /> <br />Concurrent with the Right-of-Way ac�vi�es, the Project team is also working to finalize <br />the design plans for the project. There is coordina�on work with other stakeholders <br />related to that ac�vity, but no public interface is expected. <br />
The URL can be used to link to this page
Your browser does not support the video tag.