My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC22-08 0085 PC Reso Recommending CEQA
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2022
>
Reso PC22-08 0085 PC Reso Recommending CEQA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 11:34:07 AM
Creation date
7/31/2024 11:33:44 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
11/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Findings and Statements Required by the California Environmental Quality Act <br />Harbor View Project PAGE 31 OF 48 ESA / 170951 <br />Final Environmental Impact Report October 2022 <br />ATTY/RESO.0085/PC RESO RECOMMENDING CEQA – EXHIBIT A <br />REV: 11-02-2022 VR <br />it will develop, submit for approval and implement a construction management plan <br />that specifies measures that would reduce impacts of construction-related traffic to motor vehicle, <br />bicycle, pedestrian, and transit circulation. This finding is based on the entire record of proceedings <br />for the Project, including but not limited to the discussion and analysis set forth on DEIR page 4.14- <br />61 through 4.14-62, FEIR pages 2-19 throughout 2-21, and full statements of the impact and <br />mitigation measure on FEIR page 4-26, are hereby incorporated herein in its entirety. <br />Cumulative Intersection Operations <br />Impact TRANS-24: The Project would contribute a considerable amount of traffic and <br />increase intersection delay by more than five seconds in the AM and PM peak hours for <br />intersection #1 Veterans Boulevard / Whipple Avenue. <br />Mitigation Measures. Mitigation Measure TRANS-24 (Signal Improvements) (FEIR p. <br />4-28) will be implemented for the Project as provided in the MMRP. <br />Findings Regarding Impact TRANS-24: Based on the FEIR and the entire record before <br />the City, the Council finds that Mitigation Measure TRANS-24 would substantially lessen the <br />severity of Impact TRANS-24 such that this potential impact would be less than significant because <br />it will implement improvements to signal operations at this intersection. This finding is based on <br />the entire record of proceedings for the Project, including but not limited to the discussion and <br />analysis set forth on DEIR page 4.14-73, FEIR pages 2-19 throughout 2-21, and full statements of <br />the impact and mitigation measure on FEIR page 4-28, are hereby incorporated herein in its <br />entirety. <br />Cumulative Freeway Operations <br />Impact TRANS-33: Under Cumulative Plus Project Conditions, the Project would <br />considerably contribute to inadequate emergency access. <br />Mitigation Measures. Mitigation Measure TRANS-33 (Emergency Vehicle Pre- <br />Emergency Share) (FEIR p. 4-30) will be implemented for the Project as provided in the <br />MMRP. <br />Findings Regarding Impact TRANS-33: Based on the FEIR and the entire record before <br />the City, the Council finds that Mitigation Measure TRANS-33 would substantially lessen the <br />severity of Impact TRANS-33 such that this potential impact would be less than significant because <br />the Project applicant shall install emergency vehicle pre-emption equipment to this intersection. This <br />finding is based on the entire record of proceedings for the Project, including but not limited to the <br />discussion and analysis set forth on DEIR page 4.14-84, FEIR pages 2-19 throughout 2-21, and full <br />statements of the impact and mitigation measure on FEIR page 4-30, are hereby incorporated herein <br />in its entirety. <br />VI. Findings Regarding Project Alternatives <br />The CEQA Guidelines require that an EIR describe a reasonable range of alternatives that <br />would feasibly attain most of the basic project objectives but would avoid or substantially lessen
The URL can be used to link to this page
Your browser does not support the video tag.