My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC22-09 0083 PC Reso Recommending General Plan Amendment Approval Harbor View Project
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2022
>
Reso PC22-09 0083 PC Reso Recommending General Plan Amendment Approval Harbor View Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 11:35:40 AM
Creation date
7/31/2024 11:35:03 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
11/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0083/PC RESO RECOMMENDING GENERAL PLAN AMENDMENT APPROVAL – HARBOR VIEW PROJECT – EXHIBIT D <br />REV: 11-02-2022 VR <br />Page 10 of 16 <br />53. Railroad Crossing Improvements – a. Prior to receiving any certificate of occupancy, whether temporary or final, for the <br />internal tenant improvements, an approved GO 88-B shall be obtained from the <br />California Public Utilities Commission (CPUC) for the required railroad crossing <br />improvements. The applicant shall prepare the necessary plans and provide any <br />necessary funding associated with obtaining the GO 88-B. In the event the final <br />approved plans for the crossings require any changes to previously approved site <br />plans, applicant shall be responsible for obtaining any revised permits and all costs <br />associated with the changes. b. Prior to receiving any certificate of occupancy, whether temporary or final, for the <br />internal tenant improvements, the Project applicant or Union Pacific Railroad (UPRR), <br />as determined by UPRR, shall upgrade the railroad crossings at Blomquist Street, Stein <br />Am Rhein Court, and the spur track west of the Project, as required by UPRR. The <br />applicant shall be responsible for all costs associated with the improvements. The <br />Project applicant may work with UPRR to develop and construct temporary/interim <br />improvements acceptable to UPRR to obtain a temporary certificate of occupancy. <br />[COA][ENGINEERING] 54. Shoring for Excavations – No tiebacks shall extend into the public right of way or onto <br />adjacent properties without the written agreement of the City and/or private property <br />owner. Any tie-backs within the City’s right of way shall be de-tensioned prior to permit <br />sign-off and/or project acceptance. [COA] [ENGINEERING] <br />Fire and Safety 55. Radio Coverage for Emergency Responders – All building and parking garages shall have <br />approved radio coverage for emergency responders within the building. Upon completion <br />of the building construction, a radio coverage test shall be conducted per the applicable <br />codes and standards and if the test fails an Emergency Responders Radio Coverage System <br />shall be installed. The applicant shall verify any Blue Box phone communication <br />requirements with the Redwood City Police Department. [COA][POLICE] 56. Alternate Methods and Materials Request (Sheet C-20) - The plans show automatic <br />standpipe outlets around all structures except the amenities building, suggesting these are <br />proposed as an alternative to fire apparatus access roads in accordance with CFC §503.1. A <br />formal alternate methods and materials request is required. [CFC §104.9] FC2: All alternate <br />methods and materials requests must be submitted, reviewed and approved/rejected by <br />the City of Redwood City prior to issuance of the first building permit for the project. <br />[COA][FIRE] 57. Fire Apparatus Access Road - Sheets C20 and C21- Fire apparatus access roads must be <br />provided for every building. The fire apparatus access road must extend to within 150-feet <br />of all portions of the facility and all portions of the exterior walls of the first story of the
The URL can be used to link to this page
Your browser does not support the video tag.