My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso23-18 Reso 0074 Approving Downtown Planned Community Permit for Project at 1100 El Camino Real
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
Reso23-18 Reso 0074 Approving Downtown Planned Community Permit for Project at 1100 El Camino Real
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 11:47:34 AM
Creation date
7/31/2024 11:47:23 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
7/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JOHANNA STREET, ARCHITECT Page 3 <br />Wood louvered screen <br />Wood frame storefront with single-pane glazed wood entry doors with a jalousie 2 <br />transom and two fixed sash windows <br />Brick planting boxes <br />Flat boxed awning with wood letters that spell out “Roy’s Cleaners.” <br />Painted signage on the west elevation <br />Three multi-pane steel sash casement windows* <br />Two one-over-one double hung wood windows* <br />Personnel entry door with transom* <br />Freight entry door* <br />*The last four items in the list that are starred are on the side (Harrison Avenue) elevation <br />which is of secondary importance. <br />This author concurs with the findings in the DPR form for the subject property which is <br />included in Attachment A. <br />Project Description <br />The proposed project includes a vertical addition to the existing building and change of <br />use from a dry cleaning business to a restaurant. The existing building is currently one- <br />story (about 15 feet high) and the proposal will add a story; doubling the height of the <br />building. The second story addition will be set back six feet from the front elevation <br />according to the drawings dated 10.27.2021. It will also be set back six feet from the <br />Harrison Avenue elevation. There is no set back of the second story addition at the rear <br />and side elevation. <br />Figure 3. Rendering of current proposed project. <br />2 The jalousie was not extant during the site visit. <br />ATTY/RESO.0074/ PC APPROVING DOWNTOWN PLANNED COMMUNITY PERMIT FOR PROJECT AT 1100 EL CAMINO REAL <br />REV: 07-11-2023 JB <br />Page 8 of 23
The URL can be used to link to this page
Your browser does not support the video tag.