Laserfiche WebLink
ATTY/ORD.0010/CC ORD AMENDING MUNI CODE CH.18, 27A, 30 – EXHIBIT C <br />REV: 09-17-24 VR <br />Page 26 of 65 <br />shall be required to make offsite utility infrastructure improvements to provide sufficient <br />capacity to serve the proposed subdivision. Additionally, the City Engineer may require <br />oversizing of infrastructure within a subdivision if it is reasonably necessary to provide for <br />the future development in the area. Such oversizing will be eligible for utility capacity fee <br />credit. <br />B. Water Supply: The source of water for all divisions in the City shall be the City water <br />system. The sizing of mains and service lines, and the design of the system shall be in <br />accordance with City Engineering Standards, as confirmed by the City Engineer and Fire <br />Chief. Fire hydrants shall be placed within 50 feet of the fire department connection with <br />final placement determined by the Fire Chief and City Engineer based upon field conditions. <br />C. Recycled Water: The source of recycled water for all divisions in the City shall be the City <br />recycled water system. The sizing of mains and service lines, and the design of the system <br />shall be in accordance with City Engineering Standards, as confirmed by the City Engineer. <br />D. Fire Alarm Boxes: The location, type and number of fire alarm boxes shall be subject to <br />the approval of the Fire Chief to confirm compliance with the applicable codes and <br />standards. All fire alarm boxes shall be installed by the subdivider. <br />E. Public Utilities: Utility easements for gas, underground electrical and communications <br />distribution services shall be provided by the subdivider. Unless the subdivision is located <br />within a previously platted area with rear lot line easements, all such easements shall be <br />along the street frontage. All utility distribution services shall be underground in <br />subdivisions, except as follows: <br />1. Pedestal mounted terminal boxes and meter cabinets. <br />2. Metal or wooden poles for street lights. <br />3. Electrical distribution lines carrying in excess of 34.5 kv. <br />4. Minor subdivisions (4 or fewer lots) in residential zones may pay an in-lieu fee per <br />section 18.242 instead of complying with this standard. <br />5. New residential buildings in which one hundred percent (100%) of the units are <br />subject to an affordable housing deed restriction. <br />The subdivider shall be responsible for coordination of design and installation standards <br />with the affected utilities. <br /> <br />