My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.02.08 Special Meeting
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.02.08 Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2025 4:54:44 PM
Creation date
2/10/2025 4:53:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
2/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Completed On Track Delayed <br /> <br />GUIDING PRINCIPLES AND GOALS – FY 2024-25 Mid-Year Progress Page | 11 <br /> <br />Goals Department Quantifiable Measure <br />of Progress <br />(0%, 25%, 50%, 75%, <br />100%) <br />Update <br />If delayed, include detail as to cause <br />Conduct a fee study to re-evaluate <br />administrative fees of the City’s Cannabis <br />Retail program by March 2025. CM 25% <br />Contract with firm is executed; kickoff meeting <br />for the study took place January 21, 2025. The <br />analysis is expected to be completed by the end <br />of March 2025, with a revised fee study coming <br />to City Council in April-May 2025. <br />Implement near-term improvements for <br />the Pedestrian Mall on Broadway and <br />Redwood Creek with first phase <br />improvements completed by March 2025. <br />CM 25% <br />This has been split into six sub-streams of work, <br />all of which are currently underway and in <br />varying stages of design. Engineering staff plan to <br />have all the projects completed this year. The <br />sub-streams are: <br />• Main Street Lot Enclosure (50% complete) <br />• Permanent Bollards (20%) <br />• Traffic Signal Modifications (20%) <br />• Public Art (10%) <br />• Garage Access Improvements (50%) <br />• Various Loading Improvements (50%) <br />SMARTIE Goal: By December 2024, <br />develop and finalize the scope of work for <br />the Downtown & Central Redwood City <br />Plan in collaboration with the selected <br />consultant team that outlines process <br />necessary for drafting the Plan including a <br />community engagement plan intended to <br />reach the breadth of the Redwood City <br />community. <br />CD 100% <br />Scope and outreach plan are complete. <br /> <br />5.A. - Page 48 of 75 <br />50
The URL can be used to link to this page
Your browser does not support the video tag.