Laserfiche WebLink
REV: 03-20-25 LF <br />types, wire schedules, grounding details, etc. Utilities will be coordinated with <br />PG&E. A final utility design package with utility coordination for new service, if <br />needed, will be included. <br />-Final Specifications: Consultant will finalize the specifications developed in the <br />65% Design stage based on the final design. <br />•Rough Order of Magnitude (ROM) Estimate: Consultant will provide a <br />construction ROM estimate, a +/- 10% construction cost estimate based on the <br />100% Complete Design site plan and details. At the request of the Public Works <br />Fleet Superintendent or their designee, Consultant will provide a Bill of Materials, <br />not included in the ROM estimate deliverable, as an additional service based on the <br />labor rates provided. <br />2.2 Final Construction Drawings. Upon City approval of plans and specifications, <br />provide final construction drawings in digital format and one set of mylars, sealed and <br />signed by a supervising California Professional Engineer (PE). Submit project <br />specifications in digital format. <br />•Basis of Final Design Scope: Drawings will include, walkways, signage and <br />striping, and ADA compliant charging if required. Final Construction Drawings will <br />be stamped drawings and construction specifications, signed by a PE licensed in <br />the State of California. At the request of the Public Works Fleet Superintendent or <br />their designee, Consultant will provide the following items not included in the design <br />deliverable as an additional service based on the labor rates provided: Geotechnical <br />report, coordinating modifications of utility-provided easement documents, bill of <br />materials, commissioning, Wi-Fi design, relay settings files, trash enclosure, <br />concrete masonry unit (CMU) wall design, Right-of-Way (ROW) improvements, <br />Best Management Practices (BMP), Stormwater Pollution Prevention Plans <br />(SWPPP), Water Quality Reviews (WQR) and water, stormwater and sewer design. <br />2.3 Bid Package. Provide bid package including design, engineering, environmental <br />review, construction documents and permitting/utility provider coordination for site. <br />The City will be responsible for preparing contractual front ends for the bid packages <br />to include but not limited to contracts and City bid forms. <br />Deliverables: Final Plans, Specifications, Cost Estimates, Construction Drawings, and Bid <br />Package. <br />TASK 3: BID STAGE SERVICES <br />3.1 Pre-Bid conference. Up to two (2) Consultant staff will attend the mandatory pre-bid <br />ATTY/AGR.2025.050/Black & Veatch (EVSE Consulting and Engineering) (Page 17 of 23)