Laserfiche WebLink
REV: 02-27-25 LF <br />Task 1.2 - Perform site surveys and prepare site survey reports for customers <br />Consultant shall conduct a general site evaluation in the presence of the site’s landscape <br />maintenance company or site’s representative to assess the overall requirements of <br />converting a non-potable system to recycled water. <br />Consultant shall invite the City to attend the site evaluation. As part of the investigation, <br />Consultant shall take representative pictures of the site. <br />Consultant shall conduct, if possible, an initial one-way (non-potable system only) <br />standard or pressure cross-connection shutdown test. The test will follow the procedures <br />described in Tasks 5 or 6, as appropriate. <br />Consultant shall summarize the results of the site evaluation in a site survey report that <br />will discuss: <br />The site information <br />The non-potable system <br />The results of the one-way cross-connection shutdown test <br />The overall conversion requirements to convert the non-potable system to recycled <br />water <br />The recycled water conversion process specific to the site <br />The estimated construction cost for the conversion of the non-potable system <br />Task 1.2 Deliverable: <br />Consultant shall submit electronically in PDF format to the City a draft and final site <br />survey report <br />Task 1.2 Schedule: <br />Consultant shall submit electronically in PDF format to the City <br />o A draft site survey report within three weeks of the site visit <br />o A final site survey report within one week from receipt of City comments <br />For Task 1 overall, <br />The City will provide site-specific information such as customer information and <br />non-potable demands. <br />If Consultant waits one hour with no response and no show from the site <br />representative for a scheduled site investigation, Consultant may charge a <br />cancellation fee of one hour for one staff member. The cancellation fee will be <br />based on the hourly rate of the appropriate position. <br />Task 2 – Perform plan check reviews for recycled water and cross connection <br />projects <br />Consultant will review project submittals provided by the City. It is anticipated that a <br />submittal will include the following: <br />Title 22 Recycled Water Engineering Report <br />Irrigation drawings (off-site, on-site, within a building) <br />On-site and off-site civil improvements plans <br />ATTY/AGR.2025.032/West Yost & Associates, Inc. (Page 12 of 22)