My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 West Yost & Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 West Yost & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2025 12:15:03 PM
Creation date
5/15/2025 12:14:57 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
consultant to provide recycled water and cross-connection program consultation and support services.
Date
4/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 02-27-25 LF <br />Plumbing plans for dual-plumbed buildings <br />Site specific cross-connection test plan <br />If requested by the Water Resources Public Works Utilities Field Supervisor or a Water <br />Resources Specialist, the Consultant shall perform the following potential tasks: <br />Evaluate submittal for compliance with City’s standards and SWRCB <br />requirements. If the submittal is not in general compliance, annotate the <br />documents and provide correspondence to the City identifying the necessary <br />changes. <br />Review revised submittal for conformance with City’s and SWRCB requirements <br />and for potential changes made to the submittal which were not provided on the <br />original submittal. Return to the City any plans not in compliance, with annotations <br />identifying any noncompliance items or changes from the original submittal. <br />Consultant is not responsible for paying any agency fees. <br />Task 2 Deliverable: <br />Consultant shall submit electronically in PDF format to the City annotations to <br />documents and correspondence summarizing comments as described above <br />Task 2 Schedule: <br />As directed by the City <br />Task 3 – Develop plans for recycled water and cross connection projects <br />As requested by the City, Consultant shall prepare plans for recycled water and cross <br />connection projects, including, but not limited to, plans for new projects or retrofit plans <br />for the conversion of the existing non-potable systems. Consultant shall prepare plans <br />following all applicable standards and regulations. <br />For Retrofit Plans <br />Consultant shall prepare retrofit plans for the conversion of existing potable or/and non- <br />potable systems. Retrofit plans will be prepared following the City’s Engineering Design <br />Standards and City’s Customer Guidelines for Recycled Water Use. <br />Consultant will conduct a field investigation visit that will include: <br />The site’s current landscape maintenance company or building maintenance <br />company to locate potable water facilities and the irrigation facilities or non-potable <br />systems that will be converted to recycled water. <br />Irrigation facilities include above-grade items such as quick coupler valves, remote <br />control valves, controllers, backflows, and meters. <br />Potable facilities include a drinking fountain, building isolation valve, hose bibs, <br />backflows, and meters. <br />The field investigation will use existing controller maps, if available, or plumbing plans to <br />assist with locating the existing facilities. Consultant will then prepare retrofit drawings <br />(11”x 17”) that incorporate the field investigation results. The irrigation system retrofit <br />ATTY/AGR.2025.032/West Yost & Associates, Inc. (Page 13 of 22)
The URL can be used to link to this page
Your browser does not support the video tag.