REV: 02-27-25 LF <br />Once the potable water meter is secured and shutoff, the Consultant will <br />depressurize the system. <br />The Consultant will allow the recorders to run for a minimum of two hours (or as <br />approved by the City). With the proposed recycled water system fully pressurized, <br />the site’s representative will operate the recycled water system as directed by the <br />Consultant. <br />At the end of the shutdown test, the Consultant shall re-establish potable water <br />line pressure while the digital pressure recorders are running to obtain the final <br />pressure spike before completing the potable phase shutdown test and beginning <br />the recycled water phase of the shutdown test. <br />If there are no significant pressure increases and flow variations, the test is successful. <br />Recycled Water Pressure Cross Connection Shutdown Test <br />Consultant shall receive approval through a test plan as described above for exact <br />procedures for the site prior to conducting each test. The recycled water pressure cross- <br />connection shutdown test, in general, involves the following actions: <br />On all recycled water meters, the Consultant will install digital pressure recorders <br />on all reduced pressure principal backflow prevention assemblies or at a quick <br />coupler valve. <br />The Consultant shall verify that the recorders are operating properly and allowed <br />to track under full pressure for at least 10 minutes before isolating and <br />depressurizing the system. <br />Once the recycled water meter is secured and shut off, the Consultant will <br />depressurize the system to at least 30 percent of the potable line pressure. <br />The Consultant will allow the digital pressure recorders to run for a minimum of two <br />hours (or as approved by the City) with the potable water system fully pressurized. <br />On irrigation systems, the site’s representative will set every irrigation station to <br />run on a two-minute per station test cycled during the test. <br />At the end of the shutdown test, the Consultant shall re-establish recycled water <br />line pressure while the digital pressure recorders are running to obtain the final <br />pressure spike before completing the shutdown test. <br />If there are no significant pressure increases and flow variations, the test is successful. <br />For Task 5 overall, <br />If Consultant waits one hour with no response and no show from the site <br />representative for a scheduled cross connection test, Consultant may charge a <br />cancellation fee of one hour for one staff member. The cancellation fee will be <br />based on the hourly rate of the appropriate position. <br />Consultant is not responsible for paying any agency fees. <br />Task 5 Deliverables: <br />Prior to performing the test, Consultant shall submit electronically in PDF format to <br />the City the site-specific pressure cross-connection test plan <br />ATTY/AGR.2025.032/West Yost & Associates, Inc. (Page 16 of 22)