My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 West Yost & Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 West Yost & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2025 12:15:03 PM
Creation date
5/15/2025 12:14:57 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
consultant to provide recycled water and cross-connection program consultation and support services.
Date
4/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 02-27-25 LF <br />After performing the test, Consultant shall submit electronically in PDF format to <br />the City the cross-connection test report <br />Task 5 Schedule: <br />Consultant shall submit electronically in PDF format to the City: <br />o Test results report within two days of the cross-connection test <br />Task 6 - Plan and perform standard shutdown cross connection tests <br />Consultant shall perform this task with an AWWA-certified Cross Connection Control <br />Specialist. <br />The standard cross-connection shutdown test must follow the approved test plan. The <br />standard cross-connection shutdown test is usually performed by a Specialist hired by <br />the customer in the presence of the site supervisor and a City’s representative. If directed <br />by the City, Consultant can represent the City during a standard cross-connection <br />shutdown test or conduct that test. <br />Prior to performing the standard cross-connection shutdown test, Consultant shall <br />develop a site-specific cross connection shutdown test plan. After developing the test <br />plan, Consultant shall send the plan to the City for review. If the test plan is included with <br />an Engineering Report submittal for a dual-plumbed project, the City will send the test <br />plan to the SWRCB for their review and approval. Consultant must receive approval from <br />the City (for irrigation or industrial projects) or from the SWRCB (for dual-plumbed <br />projects) prior to performing the test. <br />The standard cross-connection shutdown test is a visual test where the presence and <br />absence of flow in both the potable water and the recycled water is observed. This test <br />must be conducted with all facilities fully operational. <br />Consultant shall receive approval through a test plan as described above for exact <br />procedures for the site prior to conducting each test. The test, in general, will involve: <br />The pressurization of the potable water system and de-pressurization of the <br />recycled water system. <br />The flow verification from the potable water outlets and the absence of flow from <br />the recycled water system outlets. <br />The pressurization of the recycled water system and de-pressurization of the <br />potable water system. <br />The flow verification from the recycled water outlets and the absence of flow from <br />the potable water system outlets. <br />At the end of the test, Consultant will review the customer’s Specialist cross-connection <br />test form for accuracy and completeness and will provide a copy to the City. <br />For Task 6 overall, <br />If Consultant waits one hour with no response and no show from the site <br />representative for a scheduled cross connection test, Consultant may charge a <br />ATTY/AGR.2025.032/West Yost & Associates, Inc. (Page 17 of 22)
The URL can be used to link to this page
Your browser does not support the video tag.