My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2025.05.12 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
AgdaPkt 2025.05.12 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2025 12:53:20 PM
Creation date
5/23/2025 12:48:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/12/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
5/23/2025 12:53 PM
Modified:
5/23/2025 12:53 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
633
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 4 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />Figure 1: Project Vicinity Map <br />Once the Bradford Storm Drainage Pump Station is upgraded and constructed, an increased electrical <br />service will be required to provide adequate electrical service for the new and improved pump station. <br />ANALYSIS <br />Pacific Gas and Electric (PG&E) must upgrade their existing infrastructure to support electrical service for <br />the upsized pump station. <br />On November 18, 2024, PG&E provided the City with a Gas and Electric Extension Agreement Invoice to <br />provide electrical service to the Bradford Storm Drainage Pump Station. The referenced invoice in <br />Attachment A reflects the latest joint design for PG&E to provide electrical service to support the Project. <br />Although the project requires electric service only, not gas service, PG&E offers four standard payment <br />options in their invoice: <br />1. 10-year refundable advance option gas and electric - $407,093 <br />EL <br />C <br />A <br />M <br />I <br />N <br />O <br /> <br />R <br />E <br />A <br />LCORDILLERAS CREEKWOODSIDE RDEL <br />C <br />A <br />M <br />I <br />N <br />O <br /> <br />R <br />E <br />A <br />L <br />Eastern Low-Lying Area <br />Bradford Watershed <br />Bradford Pump Station <br />6.A. - Page 2 of 13 <br />6
The URL can be used to link to this page
Your browser does not support the video tag.