Laserfiche WebLink
REV: 04-04-25 LR <br />evaluation will include visual observations of cracking, spalling, exposed aggregate, <br />foundation settlement, and other visually apparent structural deficiencies. Each pump <br />station will include a site civil assessment including observations of the site’s <br />ingress/egress, security, drainage, settlement, and fencing and paving conditions. <br />Subtask 13.2 Assumptions <br />During each site visit, Woodard & Curran will be joined by City staff and operators <br />knowledgeable about the condition, operation, and historical maintenance/repairs <br />of each pump station. City staff will be prepared to discuss any current operational <br />issues with respect to the condition of the pump station facilities, including wet <br />wells, dry wells, mechanical systems, piping, valves, major equipment and <br />electrical equipment including standby power (diesel engine generators). <br />Destructive and non-destructive testing of any sort is not included. <br />Visual observation of existing electrical utility company equipment and installation <br />will be included and documented. Observation will include pad mount transformers <br />and location and condition of overhead lines within proximity of the pump station. <br />Electrical observation to be coordinated with the City’s electrical team / person. <br />Electrical checking such as insulation check, resistance of contacts, and control <br />device operation is not included. <br />Assessment of electrical equipment will be limited to visual checking and <br />photographs of signs of wear, corrosion, flashover/carbon deposits, age, and <br />Electrical Code clearances. Assessment is not intended to be an inspection of the <br />facilities for Code compliance. However, if Electrical Code issues are observed, <br />they will be incorporated into the assessment report. <br />Review of control system logic and control strategies is not included. <br />The condition assessment does not include a load study, short circuit rating <br />confirmation, device coordination review, or Arc Flash Study. <br />Structural observation does not include evaluation or calculations to verify seismic <br />capacity or expected seismic performance of structures or pump station <br />components. <br />Woodard & Curran will not enter any OSHA-defined confined spaces, which may <br />include wet wells and dry wells. Should entry into such spaces be required to <br />complete an asset assessment, Woodard & Curran will rely on photos/videos <br />provided by the City. <br />Woodard & Curran will not operate any equipment or open electrical panels. If <br />operator(s) can safely operate equipment and open such panels for observation, <br />Woodard & Curran will include observed conditions in its assessment. Use of <br />specialized arc rated PPE by Woodard & Curran will not be required. <br />Site visits do not include force mains, which are assumed to be inspected per <br />separate contract. <br />Geotechnical site investigation is not included at any of the pump stations. <br />No additional flow monitoring, system modeling, or pump analysis will be <br />conducted. <br />ATTY/AGR.2025/Amend. No. 2/Woodard and Curran (Page 7 of 13)