My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 AARC Consultants, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Under $108K
>
Agmt25 AARC Consultants, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2025 1:06:44 PM
Creation date
6/16/2025 1:06:39 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304.5
Date
6/6/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 05-27-25 LF <br />•Addressing local agreements (e.g., site leasing, mutual support, <br />alternative drinking water sources, etc.). <br />•Development of a cyber incident response checklist aligned with <br />industry standards and legislative requirements. <br />•Focus on resiliency and continuity planning. <br />5. Mitigation Actions <br />•Recommendations for alternative water sources, facility improvements, <br />and other measures to reduce risks. <br />•Recommendations for Natural Hazard Mitigation Plan elements in <br />alignment with the Disaster Mitigation Act of 2000 and FEMA Mitigation <br />Planning Guidelines. <br />6. Detection Strategies <br />•Methods for identifying physical and cyber threats, informed by the RRA. <br />7. Model Media/Press Release Format <br />•A customizable template for crisis communication, ensuring accurate <br />and timely public updates. <br />8. Rip-and-Run Sections <br />•Quick reference guides/checklists for staff use during emergency <br />events. <br />3.4 Address Review Comments <br />Consultant shall hold an ERP review meeting to evaluate the plan’s effectiveness, <br />ensuring it aligns with regulatory requirements and operational needs. Consultant shall <br />present an overview of the draft of the updated ERP. City shall provide feedback on key <br />components, including response procedures, communication protocols, and resource <br />allocation. Consultant shall respond to these comments by addressing City’s input, refine <br />strategies, and make necessary revisions to enhance clarity and functionality. This <br />ensures that the final ERP is comprehensive, actionable, and tailored to strengthen <br />emergency preparedness and response capabilities. <br />3.5 Finalize ERP <br />Consultant shall develop the final ERP after incorporating City’s feedback, refining risk <br />evaluations, and validating resilience strategies. This document provides a <br />comprehensive, AWIA–compliant plan tailored to this project. The ERP is designed to <br />empower the organization with the necessary knowledge, tools, and strategies to build a <br />resilient utility. <br />3.6 Submit Final Certification to EPA <br />Consultant shall assist the City in preparation to submit an electronic certification with the <br />EPA that involves submitting a formal statement confirming that the ERP meets federal <br />requirements. This process verifies that utilities have effective response strategies for <br />natural hazards, cyber threats, and other potential emergencies. Timely certification <br />ensures utilities comply with regulatory mandates, improve their emergency <br />ATTY/AGR.2025.124/AARC Consultants, LLC(RRA and Update to ERP 2025) (Page 16 of 20)
The URL can be used to link to this page
Your browser does not support the video tag.