Laserfiche WebLink
<br />Lower Lateral Replacement Project 2025 Form EX A - SCOPE OF WORK <br /> <br />PVC wye connection to the main is required. Strap-on-wye saddles will not be <br />allowed. <br />B. Sewer lateral replacement work, trenching, and backfill shall conform to all <br />applicable City of Redwood City Engineering Standards available online at <br />https://www.redwoodcity.org/departments/community-development- <br />department/engineering-transportation/engineering/engineering-standards. <br />C. Roadway paving and surfacing, concrete restoration, and roadway marking and <br />accessories shall conform to County of San Mateo Standards, available online at <br />https://www.smcgov.org/publicworks/permits and <br />https://www.smcgov.org/media/153558/download?inline=. <br />D. Payment shall include all labor, equipment, materials, fittings, and other <br />accessories necessary to complete the work to standard, including dewatering, <br />wastewater flow control, all bypass piping and pumping, backfill, surface <br />restoration, concrete and AC pavement removal, disposal, and restoration, <br />concrete sidewalk, concrete curb and gutter, concrete valley gutter, and concrete <br />driveway removal, disposal, and restoration, provision of Class 2 AB for trench <br />backfilling and compaction for trenches deeper than 30 inches as measured from <br />the top of pipe to the existing pavement surface, any landscape restoration <br />including but not limited to grass lawn, plants, pavers, bricks, decorative stones, <br />washed stones, wood headers etc., and all other incidentals required by the <br />Contract, regardless of depth and length. <br />E. Payment for sheeting, shoring, and bracing to furnish and replace the lower <br />sewer lateral shall be made under separate Bid Item No. 2. <br /> <br />Project Specifications: The following documents are included as part of Exhibit A. These <br />documents provide detailed requirements and standards relevant to the execution of the work. <br /> <br />A. Section 01 3500 Notification to Residents and Businesses <br />B. Section 01 5500 Traffic Regulations <br />C. Section 02 1330 Stormwater Pollution Prevention <br />D. Section 02 2020 Trenching and Backfill <br />E. Section 02 7300 Sanitary Sewers <br />F. Section 02 7310 Cleaning of Pipe <br />G. Section 02 7400 Flow Bypass Systems <br />H. Standard Detail Sanitary Sewer Lateral (New Connection to Existing Sewer Main) <br />I. Standard Detail Utility Trench Detail UT-1 <br /> <br />These documents follow this section and are provided for reference and compliance throughout <br />the duration of the project. <br /> <br />