My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Under $108K
>
Agmt25 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 2:00:33 PM
Creation date
6/27/2025 1:59:53 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Lower Lateral Replacement Project
RMP File Number
304.5
Date
6/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SANITARY SEWERS 02 7300-4 <br /> <br />2. Certificates of qualification for persons to be fusing HDPE pipe to verify that <br />persons fusing HDPE pipe shall be certified under 49 CFR and have a <br />minimum of 2 years of experience with fusing HDPE pipe of twelve (12) inches <br />or larger diameter. <br />3. Experience and training record of persons to be fusing HDPE pipe. <br />4. Submit written certification from the HDPE pipe manufacturer and/or fusion <br />machine manufacturer from a test-based certification program in compliance <br />with prescribed procedure in ASTM F260 that the pipe fusion technician has <br />received training in the proper use of the fusion equipment and pipe fusion <br />machine manufacturer’s recommended fusion procedures. <br />5. Written certification shall be submitted for each pipe fusion technician working <br />on the project. Pipe fusion technicians shall not be permitted to work on the <br />project until proper certification is received. <br />6. Training or requalification shall have been obtained within 12 months prior to <br />beginning work on the project. <br />7. Trail fusion welds shall be performed by a certified fusion specialist and the <br />contractors submit samples to the owner for review prior to installation of the <br />pipe. Full penetration welds shall provide homogenous material across the <br />cross section of the weld. The fusion machine employed for the trial welds shall <br />be the same machine to be utilized for the installation work. <br />F. The CONTRACTOR shall submit a sewage bypass pumping and/or diversion plan <br />for review by the ENGINEER at least 15 working days prior to pipe installation. <br />The sewage bypass pumping and/or diversion plan shall include an emergency <br />response plan to be followed in the event of a failure of the bypass pumping and/or <br />diversion system. The CONTRACTOR shall notify the ENGINEER 24 hours prior <br />to commencing the bypass pumping operation. The CONTRACTOR’S plan for <br />sewage bypass pumping and/or diversion shall conform to Section 02 7400 of <br />these specifications and be satisfactory to the ENGINEER before the <br />CONTRACTOR shall be allowed to commence sewage bypass pumping and/or <br />diversion. <br />G. As-built drawings: The CONTRACTOR shall indicate and draw, with clear and <br />accurate dimensions, on plans the as-built locations of newly installed sewer <br />mains, laterals and cleanouts. <br />1.05 JOB CONDITIONS <br />A. Note and conform with conditions and requirements indicated and specified under <br />Section 02 2020 of these Specifications. <br />B. CONTRACTOR shall conduct operations and schedule cleanup in a manner to <br />cause the least possible obstruction and inconvenience to traffic, pedestrians and <br />to adjacent property owners or tenants.
The URL can be used to link to this page
Your browser does not support the video tag.