Laserfiche WebLink
OPERATION AND MAINTENANCE PROGRAM <br />© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Redwood City use only Page 32 of 59 <br />IMPLEMENTATION PLAN/SCHEDULE <br />No. Plan Schedule Responsible Party <br /> PWS E&T <br />4.4.1 Audit inventory lists to ensure stock is adequate Annually X <br />4.4.2 Check with vendors to ensure lead times for <br />critical parts are as expected. Annually X <br />4.2.3 Ensure contracts with emergency support <br />services are current Annually X <br />RESILIENCE <br />Resilience is addressed in Element 4 by: <br />• Developing an SOP for updating maps when errors are discovered. <br />• Developing and using forms (paper or electronic) for data collection to help ensure all pertinent <br />information is consistently collected. <br />• Periodically evaluating inspection cycle intervals to help ensure they are optimized. <br />• Requiring staff to demonstrate ability and/or knowledge for all training activities. <br />• Monitoring equipment and critical spare parts usage for and trends. <br />• Performing periodic audits of the vehicle and equipment inventory List. <br />APPENDIX 4 INCLUSIONS: <br />• 4.1 Spill Response Requirements for Contracted Services <br />• 4.2 Lift Station and Generator Inspection and Work Order Forms <br /> <br />ATTY/RESO.0077/CC RESO SEWER SYSTEM MANAGEMENT PLAN - EXHIBIT A <br />REV: 07-14-25 LF <br /> <br />Page 39 of 317