My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Schaaf and Wheeler Consulting Civil Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 Schaaf and Wheeler Consulting Civil Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 10:28:58 AM
Creation date
7/30/2025 10:28:49 AM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Redwood Shores Sea Level Rise Protection
RMP File Number
304
Date
7/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 07-08-25 VR <br />o Subconsultant, Civic Edge, will plan and lead outreach activities thorough <br />the project planning and early design process to engage and inform affected <br />agencies and community members about the project’s design, align the <br />project options with existing efforts, confirm compliance with environmental <br />regulations and FEMA requirements, and incorporate all stakeholder voices <br />into the decision-making process. The goal is to establish a shared vision <br />for the project area with neighbors and other interested parties, grounded <br />in the constraints and opportunities of the area. <br />o Consultant and team will develop in coordination with the technical team <br />and the City a comprehensive Public Outreach Plan. This plan will include <br />audience mapping, a strategy for website content and multilingual <br />engagement, timeline, and outlines strategies to prioritize equity and <br />accomplish our engagement goals. Building on experience engaging <br />stakeholders on sea level rise and flooding projects, this plan will identify <br />the types of feedback that would be most helpful to the Project team. <br />Task 3.2. Align project design with existing efforts and multi-benefit opportunities: <br />o Consultant to assist City coordination with public agencies, private <br />landowners, businesses and community lifeline asset owners to sync <br />project alternatives with existing sea level rise adaptation planning <br />efforts, RSAP guidelines, and multi-benefit opportunities. This includes <br />consideration of alternatives that align with the Foster City Levee Project <br />(including a potential tie-in for contiguous shoreline protection), the <br />SamTrans Adaptation and Resilience Plan for its South Base facility, the <br />San Carlos Airport, and the Silicon Valley Clean Water Wastewater <br />Treatment Plant’s sea level rise adaptation planning, levee repair, and <br />nutrient removal opportunities (such as horizontal levee or wetland <br />treatment). Additionally, this includes consideration of nature- based <br />approaches, using the San Francisco Estuary Institute’s Adaptation <br />Atlas, other regional “living shoreline” resources and guidance, and <br />RSAP guidelines. <br />Task 3.3. Stakeholder and community outreach: Consultant and team (Schaaf and <br />Wheeler and sub-consultants, refer to schedule of rates for list of sub-consultants) <br />to propose a variety of engagement strategies that could include in-person <br />workshops, online meetings, walking tours, focus groups, presentations to <br />community groups and more. Civic Edge will also support coordination and <br />notetaking at up to 12 meetings with regulatory agencies, landowners, businesses, <br />and other stakeholders. Public engagement will be staggered with the alternative <br />analysis work to make sure that valuable feedback can be incorporated. <br />Consultant and team will provide an update to all stakeholders engaged in the <br />process once a preferred alternative is selected. <br />ATTY/AGR.2025.172/Schaaf and Wheeler Consulting Civil Engineers (Redwood Shores Sea Level Rise Protection) (Page 15 of 36)
The URL can be used to link to this page
Your browser does not support the video tag.