Laserfiche WebLink
REV: 07-08-25 VR <br />requirements for the discussion of alternatives. <br />o Basis of Design Report for the selected alternative. <br />Deliverables: Draft and Final Design criteria memorandum (PDF), Draft and Final <br />Alternative feasibility report (PDF), Draft and Final Basis of Design Report and preferred <br />project selection (PDF). <br />Task 5. 60% Design, Cost Estimate, and Schedule – FEMA Deliverable, up to <br />$663,790 Time and Materials (T&M) <br />This task provides the 60 percent plans, technical specifications, cost <br />estimate, and construction schedule for the preferred alternative selected in <br />Task 4. <br />60% PS&E for preferred project to include: <br />o Plans to include sheets as follows (sheet counts are approximate and <br />subject to change): <br />i. Title Sheet (2 sheets) <br />ii. Drawing List (1 sheet) <br />iii. Sheet Index (1 sheet) <br />iv. Notes, Abbreviations, Legend (1 sheet) <br />v. Site Access and Haul Routes (2 sheets) <br />vi. Survey Control and Layout (40 sheets) <br />vii. Demolition and Utilities (40 sheets) <br />viii. Flood Risk Levee Plan and Profile (40 sheets) <br />ix. Floodwall Profiles (10 sheets) <br />x. Retaining Wall Profiles (5 sheets) <br />xi. Trail and Shoreline Access Points (25 sheets) <br />xii. Construction Details (20 sheets) <br />xiii. Paving and Stripping Plans (20 sheets) <br />xiv. Typical Cross Sections (5 sheets) <br />xv. Cross Sections (5 sheets) <br />xvi. Structural Plans and Details (10 sheets) <br />xvii. Irrigation Plans (40 sheets) <br />xviii. Planting Plants (40 sheets) <br />xix. Landscape Details (20 sheets) <br />xx. Restoration Plans and Details (5 sheets) <br />o Specifications to include: <br />City General Specifications (front-end documents) <br />Special Provisions <br />ATTY/AGR.2025.172/Schaaf and Wheeler Consulting Civil Engineers (Redwood Shores Sea Level Rise Protection) (Page 17 of 36)