My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2025.09.08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
AgdaPkt 2025.09.08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 1:18:13 PM
Creation date
9/9/2025 1:14:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
9/8/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
9/9/2025 1:18 PM
Modified:
9/9/2025 1:18 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 of 3 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />PUBLIC NOTICE <br />Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 <br />hours prior to the meeting. <br />ALTERNATIVES <br />The City Council may choose not to accept the project or authorize the release of bonds and retention. <br />However, this would be contrary to the terms of the contract, prior City Council action, and public <br />contracting code. If retention is not released in a timely manner, the City may be liable for interest <br />payments and collection costs to the contractor. <br />The City Council may provide other direction to staff within the scope of the agreement. However, any <br />additional work would incur significant costs because the planned improvements are complete and the <br />contractor has demobilized from the site. <br />ATTACHMENTS <br />None. <br />REPORT PREPARED BY: <br />Naomi Kaw, Assistant Engineer I <br />nkaw@redwoodcity.org <br />(650) 380-6260 <br />APPROVED BY: <br />Tanisha Werner, Engineering & Transportation Director <br />Melissa Stevenson Diaz, City Manager <br />8.A. - Page 3 of 3 <br />11
The URL can be used to link to this page
Your browser does not support the video tag.