My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2025.09.29 Special Council Meeting
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
AgdaPkt 2025.09.29 Special Council Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 12:49:11 PM
Creation date
9/30/2025 12:45:33 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
9/29/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
9/30/2025 12:49 PM
Modified:
9/30/2025 12:49 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
549
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 9 of 15 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />Table 4: Vision Zero Locations and Current Activities <br />Location Status Timeline <br />Broadway and 5th Avenue <br />intersection <br />Improvements implemented as <br />part of pavement overlay <br />project. <br />2022 <br />Woodside Road between Hess <br />Road and Kentfield Avenue; <br />Woodside Road (U.S. 101 to <br />Alameda de las Pulgas) <br />Improvements are part of <br />Caltrans State Highway <br />Operation and Protection <br />(SHOPP) project. <br />2025 <br />Broadway between Cassia <br />Street and Winslow Street <br />Improvements will be installed <br />on Broadway between Chestnut <br />Street and Maple Street as part <br />of an upcoming pavement <br />project. <br />Segment between Main Street <br />and Jefferson Street will be <br />improved as part of Broadway <br />Pedestrian Mall. <br />No current plan for the segment <br />between Jefferson Avenue and <br />Winslow Street. <br /> 2026 (Chestnut to Maple <br />Streets) <br />Broadway and Main Street <br />intersection <br />Improvements are part of <br />Broadway Pedestrian Mall and <br />an approved development <br />project. <br />2026 (Broadway Pedestrian <br />Mall) <br />Development project: TBD <br />El Camino Real between Center <br />Street and Roosevelt Avenue <br />Improvements are part of <br />Caltrans’ SHOPP project. <br />2028 <br />El Camino Real and Jefferson <br />Avenue intersection <br />Improvements are part of <br />Caltrans’ SHOPP project. <br />2028 <br />Broadway and Woodside Road <br />intersection <br />Improvements are part of SR <br />84/US 101 interchange project. <br />2029 <br />Middlefield Road between <br />Woodside Road and Charter <br />Street <br />Improvement concepts and <br />traffic study are completed. <br />Improvements to be added to <br />Capital Improvement Program <br />(CIP) projects by 2028. <br />2028-2029 <br />Whipple Avenue between <br />Veterans Boulevard and El <br />Camino Real <br />No active project.- <br />Redwood Shores Parkway <br />between Twin Dolphin Drive <br />and Shoreline Drive crossing <br />enhancement <br />Preliminary improvement <br />concepts developed for the <br />intersection of Redwood Shores <br />Parkway and Shoreline Drive. <br />- <br />11.A. - Page 9 of 15 <br />392
The URL can be used to link to this page
Your browser does not support the video tag.