Laserfiche WebLink
Page 4 of 6 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />awarding the contract to Park Associates DBA Park Planet. The Supply of the Metal Structure included the <br />structural drawings and calculations, fabrication and delivery of the structure, and coordination with the <br />artist. Park Planet was open to working with the City’s Landscape Designer and Escartiz Studios on an <br />artful approach to the shade structure. The contract allowed 98 calendar days for project completion. <br />Figure 2: Metal Frame Structure <br />The metal frame structure installation was completed by McNabb Construction, Inc. on May 30, 2025. <br />There were no change orders for the Park Planet metal frame structure. The site is ready for the artist to <br />install the cladding and for Parks staff to install the landscaping portion of the project. The park is <br />anticipated to open to the public in January 2026. <br />First cladding installation – the cupola base <br />7.B. - Page 4 of 6 <br />14