Laserfiche WebLink
REV: 09-03-25 LF <br />Heavy Construction Cost Data, will be utilized. Appropriate adjustments for the bid <br />date and location of the work will be applied to the estimates. <br />Specifications will be provided by the consultant in accordance with the City of <br />Redwood City standard template with the technical specifications format as <br />approved. It is anticipated that the City of Redwood City General Specifications will <br />be used on the project and updated to contain the project requirements. <br />The consultant will provide a summary basis of Design memorandum to document <br />design criteria and decisions. <br />The following are excluded from the consultant’s scope of design and will only be <br />performed with an approved task authorization from the City in writing: <br />o Staging Plan <br />o Access Plan <br />o Dewatering Plan <br />o Disposal Plan <br />o Utility relocations plan for sewer, and storm drain laterals (small pipes), <br />electrical, telephone, gas, fiber optic, and other dry utilities, impacted by the <br />channel improvement for the Project. <br />The 60% Design submittal will include progress design drawings consisting of the <br />following: <br />o Title sheet with sheet index <br />o Standard notes, construction notes, and details <br />o Best Management Practices (BMPs) from the San Mateo County <br />o Existing conditions and demolition plan <br />o Civil plan and profile drawings <br />o Structural sections and details of hydraulic concrete channel that match the <br />existing in-situ dimensions <br />o Landscape plan <br />Assumptions: the design can be developed without reducing the cross-sectional <br />area of the channel, thus not requiring hydraulic analyses. If constraints require a <br />design that does reduce the area, then hydraulic analyses will need to be <br />conducted (not included in the scope of services of this agreement). <br />The consultant will prepare the 60% Design Submittal documents and will present <br />one digital set of the design drawings, technical specifications, draft supporting <br />structural calculation, draft bid tabulation, and Engineer’s opinion of probable <br />construction cost to the City for review. <br />Deliverables: one electronic copy (PDF) of full-size plans including structural <br />specifications and notes on drawings, one electronic copy of technical and general <br />specifications (PDF), one electronic copy of structural parameters and progress <br />calculations (PDF), and one electronic copy of engineer’s estimate of anticipated <br />construction costs (PDF and Excel). <br />Task 5. 90% Design Submittal for up to $21,045 Time and Materials (T&M) <br />The 90% design will address City comments on the 60% Submittal and prepare <br />the construction documents for the 90% submittal. The 90% design will address <br />ATTY/AGR.2025.173/Wood Rodgers, Inc. (Agreement for Design Services) (Page 14 of 21)