Laserfiche WebLink
<br />Veterans Memorial Senior Center/YMCA Project 9 Addendum #2 <br />City of Redwood City November 2025 <br />cultural resource training for construction crews, monitoring of ground-disturbing activities, <br />work stoppage if resources are uncovered, and the preparation of a data recovery plan if <br />resources are discovered to reduce the risk of potential impacts to any unknown cultural <br />resources to a less than significant level. As such, the modified project would not result in <br />any new significant impacts or more severe significant impacts than disclosed in the 2019 <br />EIR or 2022 Addendum. <br /> Hazards and Hazardous Materials. The project site does not have any known <br />contamination, and the modified project would not result in the new use or storage of any <br />hazardous materials on-site. The modified project would implement the same measures <br />identified in the 2019 EIR and 2022 Addendum to avoid exposing surrounding receptors to <br />hazardous materials and, therefore, would not result in any new significant impacts or more <br />severe significant impacts than disclosed in the 2019 EIR or 2022 Addendum. <br /> Land Use and Planning. The modified project proposes the same recreation use as the <br />original project, is consistent with existing uses in Red Morton Park, and is consistent with <br />the General Plan land use designation for the site. Like the original project, the modified <br />project would not result in the division of an established community. Therefore, the <br />modified project would not result in any new significant impacts or more severe significant <br />impacts than disclosed in the 2019 EIR or 2022 Addendum. <br /> Mineral Resources. The project site and surrounding area do not contain any mineral <br />resources or include any delineated mineral resource recovery sites. The modified project <br />does not affect these existing conditions and, therefore, would not result in any new <br />significant impacts or more severe significant impacts than disclosed in the 2019 EIR or 2022 <br />Addendum. <br /> Population and Housing/Public Services/Recreation. The project modifications would not <br />result in any increases in population or any corresponding increases in demand for housing, <br />public services, or recreation facilities and, therefore, would not result in any new significant <br />impacts or more severe significant impacts than disclosed in the 2019 EIR or 2022 <br />Addendum. <br /> Tribal Cultural Resources. There are no known tribal cultural resources on-site. The <br />modified project does not affect this existing condition and, therefore, would not result in <br />any new significant impacts or more severe significant impacts than disclosed in the 2019 <br />EIR or 2022 Addendum. <br /> Wildfire. The project site and surrounding area are not located in or near state <br />responsibility areas or lands classified as very high fire hazard severity zones. The modified <br />project does not affect these existing conditions and, therefore, would not result in any new <br />significant impacts or more severe significant impacts than disclosed in the 2019 EIR or 2022 <br />Addendum. <br /> <br /> <br />ATTY/RESO.0111/CC RESO CONSIDERING AND APPROVING AN ADDENDUM TO THE FINAL EIR (YMCA PROJECT CEQA) - EXHIBIT A <br />REV: 11-06-25 VR