My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.12.22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.12.22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 2:03:25 PM
Creation date
12/23/2025 1:54:24 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Date
12/22/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
12/23/2025 2:03 PM
Modified:
12/23/2025 2:03 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1027
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 of 4 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />EQUITY IMPACT <br />All City actions are assessed for impact. Because this item is on the consent calendar, this section indicates <br />assessment process, not findings. The anticipated impact of this policy, program, or action has been <br />assessed in the following ways: <br />Applied a geographic equity index to assess impacts by location <br />Vendor selection solicited participation by local microbusinesses, Small Business Enterprises (SBEs), <br />and/or Disadvantaged Business Enterprises (DBE, MBE, WBE, DVBE, etc.) <br />FISCAL IMPACT <br />This project has no anticipated impact on the General Fund. The Bay Road Complete Streets Rehabilitation <br />Project is funded 88.53 percent by the OBAG 3 grant ($3,806,790). The required local match of 11.47 <br />percent ($549,146) will be funded evenly by the City of Redwood City and County of San Mateo. The City’s <br />share of the $274,573 local match and a 10 percent contingency of $27,400 was budgeted in FY 2025-26 <br />CIP with Transportation Impact Fee funds. <br />ENVIRONMENTAL REVIEW <br />Executing this MOU with the county is not a project under California Environmental Quality Act (CEQA), <br />per section 15378 (b) definitions because the MOU covers administrative activities that will not result in <br />direct or indirect physical changes in the environment. <br />The project will be categorically exempt from the requirements of CEQA pursuant to CEQA Guidelines <br />Section 15301(c), Class 1 (“Existing Facilities”) for the repair and maintenance of existing highways and <br />streets with negligible or no expansion of an existing use. Staff will file the project for CEQA exemption <br />when the project advances the design phase. <br />As it is required for the federally funded projects, this project is subject to the National Environmental <br />Policy Act (NEPA). NEPA documents will be prepared and submitted to Caltrans at the 65% design stage. <br />PUBLIC NOTICE <br />Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 <br />hours prior to the meeting. <br />ALTERNATIVES <br />8.D. - Page 3 of 14 <br />112
The URL can be used to link to this page
Your browser does not support the video tag.