Laserfiche WebLink
REV: 12-03-25 LF <br />MEMORANDUM OF UNDERSTANDING <br /> BETWEEN THE CITY OF REDWOOD CITY AND COUNTY OF SAN MATEO FOR <br />THE BAY ROAD COMPLETE STREETS REHABILITATION PROJECT <br />This Memorandum of Understanding (“MOU”) is made and entered into as <br />of____________, 2025 (“Effective Date”), by and between the City of Redwood (“City”) and the <br />County of San Mateo (“County”), collectively referred to as “Parties”. <br />RECITALS <br />WHEREAS, Bay Road between Fifth Avenue and Fifteenth Avenue is essentially split <br />along the roadway centerline with half in City jurisdiction and half in County jurisdiction; and <br />WHEREAS, City and County jointly applied for One Bay Area Grant 3 (“OBAG 3”) Local <br />Streets and Roads Preservation Program Funding through the Metropolitan Transportation <br />Commission (“MTC”) for the Bay Road Complete Streets Rehabilitation Project (“Project”) which <br />includes complete streets improvements on Bay Road between Fifth Avenue and Fifteenth <br />Avenue; and <br />WHEREAS, the grant request has been awarded for a total of $3,807,000, which includes <br />funding for engineering design and construction of proposed complete streets improvements for <br />the Project; and <br />WHEREAS, on February 10, 2025, the MTC updated the Project Authorization Report and <br />assigned the City as the official sponsor of the Project; and <br />WHEREAS, Parties agreed to be responsible for their staff time needed to manage the <br />Project through design and construction phases; and <br />WHEREAS, Parties agreed to equally share the local match funds needed for the Project <br />as outlined in Section 5 below. <br />NOW THEREFORE, in consideration of the mutual covenants and conditions contained <br />herein, the Parties hereto agree as follows: <br />The terms and conditions of this MOU, all exhibits and attachments, and all documents expressly <br />incorporated by reference, represent the entire MOU of the Parties with respect to the subject <br />matter of this MOU. The terms and conditions of this MOU shall not be altered or modified except <br />by a written amendment to this MOU signed by the Parties. <br />1. Purpose. The purpose of this MOU is to establish the terms and conditions for the sharing <br />of costs and responsibilities for the design and construction phases of the Project. <br />The scope of work for design and construction phases of the Project includes: <br />Project planning, community outreach, preparation of Plans, Specifications, and Estimates <br />(“PS&E”), design drawings, construction bidding, construction, construction administration, and <br />construction inspection. <br />This MOU outlines responsibilities for each phase of the Project. Each Party agrees that upon <br />ATTY/AGR.2025.325/San Mateo County (Page 1 of 10) <br />8.D. - Page 5 of 14 <br />114