My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso24-10 0080 PC Reso 590 Veterans & 91 Winslow Project
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2024
>
Reso24-10 0080 PC Reso 590 Veterans & 91 Winslow Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 3:01:37 PM
Creation date
1/6/2026 3:01:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
1/6/2026 3:01 PM
Modified:
1/6/2026 3:01 PM
Text:
https://library.municode.com/ca/redwood_city/codes/city_code?nodeId=CH24NORE_ARTIIEXUNNO_DIV3CO
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0080/PC RESO 590 VETERANS & 91 WINSLOW PROJECT – EXHIBIT A - COA <br />REV: 11-14-24 JB <br />Page 14 of 19 <br />be extended to within one floor of the highest point of construction having secured <br />decking or flooring. [CFC §3311.1 and CFC §3313.1] <br /> <br />71. Electric Vehicle Charging Stations. Where provided, electric vehicle charging stations to <br />be installed in accordance with the California Electrical Code. Electric vehicle charging <br />system equipment to be listed and labeled in accordance with UL 2202. Electric vehicle <br />supply equipment to be listed and labeled in accordance with UL 2594. [CBC §406.2.7] <br /> <br />72. Emergency Planning and Information: Buildings four (4) or more stories in height must <br />have a posted floor plan sign to provide emergency procedures at every stairway landing, <br />elevator landing, and immediately inside all public entrances to the building. [CFC <br />907.2.12.3.1-B and Redwood City Code of Ordinances §12.23] <br /> <br />73. Radio Coverage for Emergency Responders – All building and parking garages shall have <br />approved radio coverage for emergency responders within the building. Upon completion <br />of the building construction, a radio coverage test shall be conducted per the applicable <br />codes and standards and if the test fails an Emergency Responders Radio Coverage <br />System shall be installed. Verify any Blue Box phone communication requirements with <br />the Redwood City Police Department. [COA][POLICE] <br /> <br />Construction-Related Activities <br /> <br />74. Verification for Dimensions – All dimensions, including building location on the site, <br />setbacks, building height, etc. shall be verified by a licensed surveyor. Prior to foundation <br />inspection, Owner shall provide a license survey report and submit to the building <br />inspector (for their review) to confirm the new foundation meets the City approve plans <br />for setback requirements before approval from the Building Inspector. Prior to the roof <br />nail inspection, the Owner shall provide Ridge height survey and submit to the building <br />inspector to verify that the building height does not exceed the approved plans. <br />[COA][BUILDING] <br /> <br />75. Sales and Use Taxes – Applicant shall use good faith efforts to register with the Board of <br />Equalization to create an ID prior to project construction and operation. This maximizes <br />the City’s allocation of sales and use taxes associated with project construction. Contact <br />the Finance Department at (650) 780-7097. [COA][FINANCE] <br /> <br />76. Hours of Construction – On-Site Construction activity is permitted between 7:00 a.m. and <br />8:00 p.m. Monday through Friday, except as permitted on weekends by the Building <br />Official, and shall adhere to the City’s Noise Ordinance. If possible, the noisiest <br />construction activities would be scheduled for daytime hours when the ambient noise <br />levels are highest. [SDR][BUILDING] <br /> <br />77. Construction Sign - Prior to the start of any construction work, including demolition, <br />install at least one 36” x 48” (minimum) construction sign in a visible location along the
The URL can be used to link to this page
Your browser does not support the video tag.