My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25-02 0024 PC Reso 901 El Camino Real
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2025
>
Reso25-02 0024 PC Reso 901 El Camino Real
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 3:36:38 PM
Creation date
1/6/2026 3:33:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
4/15/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0024/PC RESO 901 EL CAMINO <br />REV: 04-11-25 VR <br />Page 19 of 27 <br />materials used or where a fire hazard exists to the building or exposures due to the lack of <br />maintenance. [CFC §317.4.3] [FIRE] <br />Construction-Related Activities <br />90.Verification for Dimensions – The Applicant shall provide a survey report, prepared by a <br />licensed surveyor, verifying site building location, setbacks, and building height, if <br />applicable, to the Building Division for review and approval prior to building permit <br />issuance. Survey report shall be kept on the project site throughout the course of <br />construction and be made available to the Building Inspector for all foundation forms and <br />footings inspections. [COA][BUILDING] <br />91. Sales and Use Taxes – The Applicant shall register with the Board of Equalization to create <br />an ID prior to maximize the City’s allocation of sales and use taxes associated with project <br />construction. Contact the Finance Department at (650) 780-7213 to coordinate on this <br />process and requirements. [COA][FINANCE] <br />92. Hours of Construction – On-Site Construction activity is permitted between 7:00 a.m. and <br />8:00 p.m. Monday through Friday, except as permitted on weekends by the Building Official, <br />and shall adhere to the City’s Noise Ordinance. Schedule noisiest construction activities, as <br />identified under Section 24.30, on weekdays from 9:00 a.m. to 4:00 p.m. when ambient <br />noise levels are the highest. [SDR][BUILDING] <br />93. Construction Sign -Prior to building permit issuance, the Applicant shall install and provide <br />photo verification of at least one 36” x 48” (minimum) construction sign in a visible location <br />along the project frontage for the duration of construction. The sign shall include, at <br />minimum, the following information: project name & address, elevation or rendering, <br />construction manager (name, phone number), anticipated completion (season, year), and <br />the City’s permitting website http://permits.redwoodcity.org.[COA][PLANNING] <br />94. Construction Meetings –The Applicant is required to contact the Permit Counter <br />(650.780.7350) to schedule the following meetings prior to or during construction. <br />[COA][BUILDING] <br />Pre-Grading - Prior to the issuance of any grading permits, the Applicant shall ensure <br />all construction crews undergo a training session to inform them: 1) of the potential <br />for previously undiscovered human remains or presence and identification of federal <br />or state-eligible cultural resources within the Project area, 2) of the laws protecting <br />these resources and associated penalties, and 3) of the procedures to follow should <br />they discover human remains or cultural resources during Project related work (Refer <br />to COA no. 105 below.) [General Plan EIR Mitigation Measures 4.5-1b & 3b] <br />[COA][Planning] <br />Pre-Construction -Prior to building permit issuance, the Applicant shall schedule a <br />pre-construction meeting with Engineering, Building, Fire, and Planning staff to <br />discuss the inspection process and requirements for construction and site work. The <br />Applicant shall arrange for the attendance of the Applicant, developer, construction
The URL can be used to link to this page
Your browser does not support the video tag.