My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agm26 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agm26 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2026 3:14:33 PM
Creation date
1/9/2026 3:14:29 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Corp Yard Reconfiguration Design
RMP File Number
304
Date
1/9/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 11-26-25 LR <br />prepared in accordance with the latest City Standards, California MUTCD, and Caltrans <br />Standard Plans. The Consultant shall perform the following tasks, including, but not <br />limited to: <br />Collect any required topographic survey data to design the civil improvements and <br />prepare topographic map <br />Conduct Stormwater Pollution Prevention Plan (SWPPP) assessment <br />Collect and review utility facility maps and record drawings <br />Coordinate with utility agencies <br />Prepare base map showing existing improvements <br />Prepare underground utility mapping as needed to identify utility conflicts and to <br />ensure constructability <br />Prepare 65% design consisting of civil design and grading, construction notes, <br />construction cost estimates, and construction schedule <br />At a minimum, plans shall include the following: <br />Title sheet <br />General notes and legend <br />Right of way lines <br />Existing/Demolition Plan <br />Existing utility information (including profiles where needed) <br />Existing and proposed civil improvements (curb, gutter, drainage, pedestrian <br />ramps, etc.) <br />Electrical Plans <br />Electrical Details <br />Lighting Plans and Details <br />Piping Plans <br />Piping Details <br />Fuel Tank Details <br />Typical Details <br />Special Inspection Requirements <br />Roof/Canopy Modifications <br />Foundation Plans <br />Foundation Details <br />Roof Framing Plan <br />Framing Details <br />City and State standard details <br />Stormwater Management Plan <br />Stormwater best management practices <br />City staff will review and comment on the design and cost estimates. <br />ATTY/AGR.2025.327/BKF Engineers (Corporation Yard Reconfiguration Design Agreement) (Page 12 of 16)
The URL can be used to link to this page
Your browser does not support the video tag.