My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />6. Provide short-term, conditioned/emergency power through TCP/IP-enabled <br />UPS units for the following headend components to protect components <br />from loss of power, power spikes, and power sags: <br />a. PARCS Workstations <br />b. PARCS Servers <br />c. PARCS network switches/gateways/firewalls <br />d. Fixed LPR cameras (powered by POE from headend switches) <br />7. UPS battery back-up sized to last forty-five (45) minutes. <br />8. Facilitate a 30% expanded load with an 80% continuous load factor. <br />9. On-line, solid state UPS that provides both backup power and transient <br />surge protection. <br />10. Determine the UPS backup requirements for each of the locations where <br />UPS backup is required, based upon the equipment that is being supplied <br />by the Contractor. Owner to review and approve the UPS units to be <br />provided by the Contractor. <br />2.3 SOURCE QUALITY CONTROL <br />A. Factory Acceptance Test (FAT) <br />1.It is required that adequate documentation of the proper functioning of the <br />equipment in its complete, originally manufactured state be conducted by <br />the Contractor prior to delivery of equipment to the project site. Such <br />testing, known as a Factory Acceptance Test (FAT), is meant to ensure <br />that all equipment is known and demonstrated to be working correctly via <br />a documented FAT procedure and a certificate of completion of FAT is <br />provided to the Owner prior to delivery of the equipment. <br />2.All equipment is to have successfully passed formal manufacturing FATs <br />and quality assurance inspections to validate compliance with these <br />functional specifications prior to shipment to the project site. <br />3.Records for formal internal Contractor FAT and inspection for performance, <br />materials quality and/or workmanship are to be produced by the <br />Contractor and sent as formal project submittals to Owner for review prior <br />to shipment of equipment to the project site. Equipment is not to be <br />released for shipment until Owner has approved the FAT submittals. <br />4.Contractor is also to have readily available proof of product reliability <br />analysis and testing should reliability become a problem at any time from <br />the beginning of installation testing through the final operational test <br />period. <br />5.Owner or Owner’s agent will not physically be present at Contractor’s facility <br />for the FAT. FAT is to be conducted solely by Contractor’s personnel. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 57 of 167)
The URL can be used to link to this page
Your browser does not support the video tag.