My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />PART 3 - EXECUTION <br />3.1 INSTALLATION AND COORDINATION <br />A. Coordinate installation of MSM System with Owner and Owner’s Parking <br />Operator, in accordance with manufacturer's recommendations. <br />B. Installation and Start-Up: Contractor is to perform installation of all supplied <br />equipment and its interfacing and interconnection with Owner supplied <br />equipment. <br />C. Contractor is responsible for all software and communications by all computers <br />and peripheral devices. <br />D. Owner or Owner’s Representative may observe installation process and stop the <br />work at any time throughout the process. <br />E. Provide dust and noise protection in strict accordance with equipment <br />manufacturer's recommendations. <br />F. All equipment components installed near drive aisles shall be protected from <br />damage by vehicular movements by protective bollards. <br />3.2 FIELD QUALITY CONTROL <br />A. Provide an Acceptance Testing Plan to demonstrate the functionality of the <br />system. <br />1. Include demonstrations of compliance with all specifications, contractual <br />compliance, definitions of all test objectives, participant responsibilities, <br />documentation of tests and procedures for dealing with failures during test. <br />2. Detail tests for every functional requirement of the MSM system, including <br />PbC integration. <br />a. Include checklist for specified supplies, spare parts, training operation <br />and training manuals. <br />b. Provide space for acceptance by Contractor and Owner or Owner’s <br />representative. <br />3. Confirm that all specified features are provided and fully operational before <br />Acceptance Testing. <br />4. Notify Owner or Owner’s Representative in writing at least one week prior <br />to each official test session. If a test is not successful, correct noted <br />deficiencies and advise Owner or Owner’s Representative, at least two days <br />in advance, that test session is ready to resume. <br />5. Owner or Owner’s Representative may witness tests. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 58 of 167)
The URL can be used to link to this page
Your browser does not support the video tag.