My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />H. Rated at 30 frames per second. <br />I. Anti-theft mounting /removal brackets. <br />J. Equipped with IR lens for license plate and color image for verification. <br />K. Capable of multiple images with multiple flash and shutter settings. <br />L. Target range of 9’ to 30’. <br />M. In-camera GPS. <br />N. Pulsed LED illumination. <br />PART 3 - EXECUTION <br />3.1 INSTALLATION <br />A. Install LPR System in accordance with manufacturer's recommendations on <br />Owner-provided parking enforcement vehicles. Contractor is to coordinate such <br />installation with the City’s Fleet Vehicle team. <br />B. Installation and Start-Up: Contractor is responsible for installation of all <br />Contractor supplied equipment and its interfacing and interconnection with Owner <br />supplied equipment. <br />C. Contractor is responsible for all software and communications by all computers <br />and peripheral devices. <br />D. Owner or Owner’s Representative may observe installation process and stop the <br />work at any time throughout the process. <br />3.2 FIELD QUALITY CONTROL <br />A. Provide an Acceptance Testing Plan to demonstrate the functionality of the <br />system. <br />1. Include demonstrations of compliance with all specifications, contractual <br />compliance, definitions of all test objectives, participant responsibilities, <br />documentation of tests and procedures for dealing with failures during test. <br />2. Detail tests for every functional requirement of the system, including PbC <br />integration. <br />a. Include checklist for specified supplies, spare parts, training operation <br />and training manuals. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 75 of 167)
The URL can be used to link to this page
Your browser does not support the video tag.