My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Ensight Technologies, LLC - PARCS System
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Ensight Technologies, LLC - PARCS System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 4:18:18 PM
Creation date
1/23/2026 4:15:24 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
1/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-05-26 LR <br />b. Provide space for acceptance by Contractor and Owner or Owner’s <br />representative. <br />3. Confirm that all specified features are provided and fully operational before <br />scheduling Acceptance Testing with Owner and/or Owner’s Agent. <br />4. Notify Owner or Owner’s Representative in writing at least one week prior <br />to test session. If a test is not successful, correct noted deficiencies and <br />advise Owner or Owner’s Representative, at least two days in advance, that <br />test session is ready to resume. <br />5. Owner or Owner’s Representative may witness tests. <br />B. Passing Acceptance testing, even if performed in the presence of the Owner or <br />Owner’s Representative, does not relieve the Contractor of the responsibility to <br />provide a system in accordance with the Specifications. <br />C. Promptly correct all problems encountered at no cost to the Owner. <br />D. Thirty-Day Operational Test and Final Acceptance <br />1. After go-live date, the Owner will conduct an operational test for thirty (30) <br />days. <br />2. Performance Standards: <br />a. System is fully operational without downtime or programming <br />problems for the complete monthly reporting cycle. For each down <br />time period of between one hour and eight hours, or programming <br />problems that delay the report cycle, two days will be added to the test <br />duration. <br />b. All reports correlate 100% with MSM and PbC data. <br />3. Maintain detailed records and a logbook of all tests, events and issues to <br />be provided to the Owner upon completion of the tests. <br />3.3 INSTRUCTION AND TRAINING <br />A. Fully instruct the Owner’s designated personnel in the operation, adjustment, and <br />maintenance of all products, equipment, and systems. <br />B. Coordinate scheduling of on-site and in-person instructional classes with Owner’s <br />designated personnel to avoid conflicts and peak-period personnel demands. <br />C. Submit a proposed instruction schedule prior to equipment installation. Owner <br />will tentatively approve or suggest changes to the training schedule. <br />D. Ample time should be allotted within each session for the instructor to fully <br />describe and demonstrate all aspects of the SSSM system and allow Owner <br />personnel to have hands-on experience with the meters. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 76 of 167)
The URL can be used to link to this page
Your browser does not support the video tag.