Laserfiche WebLink
REV: 01-05-26 LR <br />b. Provide space for acceptance by Contractor and Owner or Owner’s <br />representative. <br />3. Confirm that all specified features are provided and fully operational before <br />scheduling Acceptance Testing with Owner and/or Owner’s Agent. <br />4. Notify Owner or Owner’s Representative in writing at least one week prior <br />to test session. If a test is not successful, correct noted deficiencies and <br />advise Owner or Owner’s Representative, at least two days in advance, that <br />test session is ready to resume. <br />5. Owner or Owner’s Representative may witness tests. <br />B. Passing Acceptance testing, even if performed in the presence of the Owner or <br />Owner’s Representative, does not relieve the Contractor of the responsibility to <br />provide a system in accordance with the Specifications. <br />C. Promptly correct all problems encountered at no cost to the Owner. <br />D. Thirty-Day Operational Test and Final Acceptance <br />1. After go-live date, the Owner will conduct an operational test for thirty (30) <br />days. <br />2. Performance Standards: <br />a. System is fully operational without downtime or programming <br />problems for the complete monthly reporting cycle. For each down <br />time period of between one hour and eight hours, or programming <br />problems that delay the report cycle, two days will be added to the test <br />duration. <br />b. All reports correlate 100% with MSM and PbC data. <br />3. Maintain detailed records and a logbook of all tests, events and issues to <br />be provided to the Owner upon completion of the tests. <br />3.3 INSTRUCTION AND TRAINING <br />A. Fully instruct the Owner’s designated personnel in the operation, adjustment, and <br />maintenance of all products, equipment, and systems. <br />B. Coordinate scheduling of on-site and in-person instructional classes with Owner’s <br />designated personnel to avoid conflicts and peak-period personnel demands. <br />C. Submit a proposed instruction schedule prior to equipment installation. Owner <br />will tentatively approve or suggest changes to the training schedule. <br />D. Ample time should be allotted within each session for the instructor to fully <br />describe and demonstrate all aspects of the SSSM system and allow Owner <br />personnel to have hands-on experience with the meters. <br />ATTY/AGR.2026.001/EnSight Technologies (Parking Access and Revenue Control System (PARCS)) (Page 76 of 167)