My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Kimley-Horn and Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Kimley-Horn and Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 1:46:31 PM
Creation date
2/4/2026 1:45:18 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Bay Road Complete Streets
Date
1/29/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 12-03-25 LR <br />o Draft Opinion of Probable Cost (Construction Cost Estimate) <br />Task 8 – Develop 95% Plans, Specifications and Estimate <br />Based upon one (1) set of consolidated, non-conflicting comments from the City Engineer or their <br />designee on the 65% PS&E, Consultant shall advance the Plans, Specifications and Estimate to a <br />95% Design Level. Prior to the start of this task, Consultant shall set a virtual meeting with the <br />City Engineer or their designee to discuss any last outstanding items or areas of concern that may <br />have been identified during the 65% submittal review. Consultant shall prepare a comments <br />response matrix to the City Engineer’s or their designee’s consolidated comments on the 65% <br />plans and shall provide this document as a backup with the 95% Design Plans, Specifications and <br />Estimate. City Engineer or their designee comments that lead to significant redesign and <br />additional hours allocated to this task shall be coordinated and agreed upon between City Staff <br />and the Consultant. <br />The PS&E shall be at the minimum prepared in accordance with the latest City Engineering <br />Standards, California MUTCD, and the most recent version of Caltrans Standard Plans. <br />The 95% Design Package includes: <br />95% Design Plans <br />o Cover Sheet and General Notes <br />o Key Map (with ROW information) <br />o Existing Conditions Plan <br />o Demolition Plan <br />o Improvement Plan <br />o Grading and Drainage Plan <br />o Detailed Grading Plans <br />o Utility and Drainage Plan <br />o Pavement Rehabilitation Plan <br />o Signing and Striping Plan <br />o Construction Details <br />o Landscape Plans (if applicable) <br />o Best Management Practices <br />95% Opinion of Probable Cost (Construction Cost Estimate) <br />95% Specifications <br />Response to 65% Comments <br />Profiles including Curb Radii or Roadway Centerlines will not be required and needed for this <br />project; if they are requested by the City Engineer or their designee, additional fees may be <br />ATTY/AGR.2025.333/Kimley-Horn (Bay Road Complete Streets) (Page 22 of 50)
The URL can be used to link to this page
Your browser does not support the video tag.