Laserfiche WebLink
Page 2 of 4 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />In response to a development approval at 1581 Maple Street that required raising the existing street <br />elevation by eight feet for sea level rise and flood protection, the City initiated the Maple Street Sewer <br />Interceptor 60-Inch Extension Project. The project installed approximately 126 linear feet of new 60-inch <br />polyvinyl chloride (PVC) pipe and one manhole to connect the Maple Street diversion structure directly to <br />the Silicon Valley Clean Water (SVCW) sanitary sewer pump station. The improvements increase sanitary <br />sewer capacity to support future development, enhance system reliability and operational flexibility, and <br />avoid the additional cost and roadway disruption after reconstruction. <br />On July 21, 2025, the City Council awarded the Maple Street Sewer Interceptor 60-Inch Extension Project <br />construction contract to Cratus, Inc. for $1,897,000 with a 10 percent contingency of $189,700. <br />ANALYSIS <br />Project construction began in September 2025 and completed in January 2026. Two change orders were <br />approved totaling $324,238, 17 percent above the original contract. <br />Change Order No. 1 increased the contract amount by $36,368 and included: <br />o Additional excavation, off-haul, and disposal quantity <br />o A credit associated with the material change due to lead time constraints <br />o A time extension to obtain a required discharge permit from the State Water Resources <br />Control Board <br />On February 23, 2026, the City Council authorized an increase in contingency from 10 percent to 18 <br />percent for the construction contract with Cratus, Inc. for additional work required due to unforeseen <br />subsurface conditions encountered during construction. <br />Change Order No. 2 increased the contract amount by $287,869 and included: <br />o Excavation and backfill around the junction box <br />o Excavation and backfill around the inflow box <br />o Removal and disposal of an existing abandoned 48-inch pipe <br />o Removal and disposal of a 60-inch concrete jacking pipe at the junction box <br />The construction contract cost, including change orders, are shown in Table 1 of the Fiscal Impact <br />section. <br />The City Engineer has determined that the improvements have been constructed in accordance with the <br />project plans and specifications. Therefore, staff recommend that the City Council accept the project, <br />release performance bonds and retention for Cratus, Inc., and file a Notice of Completion for this project. <br />7.B. - Page 2 of 4 <br />72