My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Walker Consultants, Inc. - Garage Repair & Elevator Modernization
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Under $110K
>
Agmt26 Walker Consultants, Inc. - Garage Repair & Elevator Modernization
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2026 4:24:30 PM
Creation date
3/31/2026 4:24:25 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304.5
Date
3/27/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 03-02-26 VR <br />g. Estimated elevator modernization timelines. <br />3) Review Meeting (one meeting) <br />Attend one (1) virtual meeting with City staff to present assessment report findings <br />and answer questions. <br />Phase 2 – Turnkey Modernization Construction Documents <br />1) 50% Construction Documents <br />a. Prepare a detailed Request for Quotation (RFQ) for the turnkey elevator <br />modernization, including the following: <br />i. Instructions to bidders <br />ii. Bid Form in excel and PDF format <br />iii. Summary of Work <br />iv. Modernization procedures <br />v. Submittals <br />vi. Included building related work (Fire Alarm, Electrical Upgrades, <br />Plumbing, HVAC, etc.) <br />vii. Continuing maintenance <br />b. Prepare comprehensive, performance based, vertical transportation <br />modernization specifications for the four (4) Elevators on site, including the <br />following: <br />i. Criteria relating to quality of equipment <br />ii. Approved products <br />iii. Performance requirements (floor-to-floor times, door times, ride <br />quality, noise requirements, etc.) <br />iv. Components required for replacement, refurbishment or retention. <br />v. Compliance with national and local accessibility codes <br />vi. Compliance with prevailing codes enforced by Authority Having <br />Jurisdiction (AHJ) <br />c. Submit a 50% completion set of Progress Documents in PDF format to City <br />Engineer or designee for review and comments. <br />2) 100% Construction Documents <br />Incorporate comments from the City Engineer or their designated representative(s) <br />and issue the final bid-ready specifications and documents for all four elevators. <br />Phase 3 – Bidding Assistance <br />1) Distribute RFP and Conduct Prebid Walk-Through <br />a. Distribute RFP to up to six (6) pre-qualified elevator contractors <br />ATTY/AGR.2026.052/Walker Consultants (Garage Repair Engineering Services) (Page 13 of 18)
The URL can be used to link to this page
Your browser does not support the video tag.