My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2026.04.13 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2026
>
Agda Pkt 2026.04.13 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:57:15 AM
Creation date
4/14/2026 10:51:29 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
4/13/2026
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
4/14/2026 10:57 AM
Modified:
4/14/2026 10:57 AM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
708
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 of 4 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />PUBLIC NOTICE <br />Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 <br />hours prior to the meeting. <br />ALTERNATIVES <br />Alternative 1: The City Council may choose not to accept the project or authorize the release of <br />performance bonds and retention. This action would be contrary to the terms of the contract, prior City <br />Council action, and public contracting code. <br />Alternative 2: The City Council may provide other direction to staff within the scope of the agreement. <br />Any additional work would incur significant costs because the planned improvements are complete and <br />the contractor has demobilized from the site. <br />ATTACHMENTS <br />None. <br />REPORT PREPARED BY: <br />Nyal Nunn, Assistant Engineer <br />nnunn@redwoodcity.org <br />(650) 780-7683 <br />Paige Saber, Senior Civil Engineer <br />psaber@redwoodcity.org <br />(650) 780-7355 <br />APPROVED BY: <br />Tanisha Werner, Engineering & Transportation Director <br />Patrick Heisinger, City Manager <br />7.A. - Page 4 of 4 <br />11
The URL can be used to link to this page
Your browser does not support the video tag.