My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Schaaf and Wheeler Consulting Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Schaaf and Wheeler Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 4:09:26 PM
Creation date
5/1/2026 4:09:19 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Redwood Creek Bank Stabilization Near 707 Bradford
RMP File Number
304
Date
4/30/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 04-02-26 VR <br />a. Confirmation of design criteria in coordination with the City <br />b. Upgrade hydraulic analysis and scour analysis with updated survey and <br />geotechnical data and to align with the selected design concept <br />c. Perform structural analysis and calculations <br />d. Development of plan and profile drawings, typical sections, and <br />construction details <br />e. Development of technical specifications <br />f. Development of draft front-end specifications. The City to provide <br />templates. <br />g. Development of engineer’s cost estimate of anticipated construction costs. <br />B. Schaaf and wheeler will coordinate with the City regarding access, construction <br />sequencing considerations, and potential utility conflicts. <br />C. Structural Engineering subconsultant, Biggs Cardosa Associates, Inc. (BCA) will <br />provide structural engineering for the rehabilitation improvements, including a site <br />visit with Schaaf and Wheeler, structural analysis, calculations, and preliminary <br />design and detailing for the steel sheet pile wall and the connection to the existing <br />channel. <br />Deliverables: electronic copies of the 60% plans, specifications, calculations, and <br />engineer’s estimate of anticipated construction costs. <br />Task 5. 90% Design Submittal (Plans, Specifications, and Cost Estimates), up to <br />$40,708 Time and Materials (T&M) <br />This task is for the consultant to advance the 60% progress documents to a 90% design <br />towards a bid-ready set. Tasks include: <br />A. Following City review of the 60% package, Schaaf and Wheeler and team will <br />advance the design to 90% completeness, incorporating City and agency input and <br />completing key design decisions needed for bidding. <br />B. The 90% submittal will include updated plans and details, near-final technical <br />specifications, and an updated engineer’s estimate. Schaaf and Wheeler will <br />perform interdisciplinary QA/QC and will coordinate with subconsultants to resolve <br />comments and finalize key design elements. <br />Deliverables: electronic copies of the 90% plans, specifications, calculations, and <br />estimate of anticipated construction costs. A construction schedule will also be submitted <br />which will outline all permit restrictions and work windows. <br />ATTY/AGR.2026.093/Schaaf & Wheeler Consulting Civil Engineers(Redwood Creek Bank Stabilization Near 707 Bradford) (Page 13 of 21)
The URL can be used to link to this page
Your browser does not support the video tag.