My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Schaaf and Wheeler Consulting Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Schaaf and Wheeler Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 4:09:26 PM
Creation date
5/1/2026 4:09:19 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Redwood Creek Bank Stabilization Near 707 Bradford
RMP File Number
304
Date
4/30/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 04-02-26 VR <br />F. HBG will coordinate with USACE, SFBRWQCB, CDFW, and resource agencies as <br />needed, including participation in agency meetings and field visits. Schaaf and <br />Wheeler will support HBG by providing design plans, sections, and technical <br />information required for permit applications and by incorporating permit conditions <br />into the final design and construction documents. <br />G. If the USACE determines that a Section 106 NHPA Consistency Determination <br />process is necessary, a CEQA-level cultural resources survey will be conducted, <br />including archaeological and historical records search, Native American <br />community outreach, pedestrian survey, and preparation of a cultural resources <br />inventory and evaluation report. <br />Deliverables: USACE Nationwide Permit application package, SFBRWQCB Section 401 <br />Water Quality Certification permit application package, CDFW Lake and Streambed <br />Alteration Agreement application package, and electronic copies of all reports, studies, <br />and memorandums needed for successful permit approval. <br />Task 8. Bid Support and Construction Administration, up to $193,405 Time and <br />Materials (T&M) <br />This task is for the Consultant to provide bid support and construction administration <br />services. Tasks include: <br />A. Schaaf and Wheeler and team to attend pre-bid meeting, and pre-construction <br />meeting. <br />B. Schaaf and Wheeler and team to provide clarifications and respond to questions <br />submitted during the bid phase. <br />C. Schaaf and Wheeler to respond to Requests for Information (RFI). <br />D. Schaaf and Wheeler and team to review submittals and testing/inspection reports. <br />E. Schaaf and Wheeler and team to attend site visits during construction (up to 3). <br />F. Schaaf and Wheeler and team to attend virtual construction meetings (up to 8). <br />G. Schaaf and Wheeler and BCA to perform structural observations and submit <br />reports to the City during construction (up to 3). <br />H. Schaaf and Wheeler and Cornerstone Earth Group to perform geotechnical <br />observations of subgrade conditions, geotextile fabric placement, rock placement, <br />and preparation of construction observation letters (up to 15 site visits). <br />ATTY/AGR.2026.093/Schaaf & Wheeler Consulting Civil Engineers(Redwood Creek Bank Stabilization Near 707 Bradford) (Page 15 of 21)
The URL can be used to link to this page
Your browser does not support the video tag.