My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt26 Schaaf and Wheeler Consulting Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2026
>
Agmt26 Schaaf and Wheeler Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2026 4:09:26 PM
Creation date
5/1/2026 4:09:19 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Redwood Creek Bank Stabilization Near 707 Bradford
RMP File Number
304
Date
4/30/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 04-02-26 VR <br />I. Huffman-Broadway Group, Inc (HGB) to perform biological monitoring services, as <br />need, and throughout the construction of the project. This scope includes the <br />following: <br />a. Submission of pre-construction authorizations to environmental agencies <br />b. Submission of pre-construction biological monitoring and provide worker <br />training to selected contractor (up to 3 site visits) <br />c. Construction biological monitoring: <br />i. Perform daily biological monitoring during construction by approved <br />Qualified Biologist (scope includes 30 working days of monitoring) <br />ii. Perform turbidity monitoring during dewatering and re-watering (as <br />necessary during 30 working day construction monitoring) <br />iii. Perform monitoring during dewatering (assumes one day for CDFW <br />Qualified Fishery Biologist to be present for dewatering) <br />d. Agency required reporting: <br />i. Perform pre- and post-construction biological monitoring status <br />reports <br />ii. Perform post-construction Fish and Wildlife relocation record/report <br />iii. Provide a project as-built report <br />iv. Notify agencies when construction is complete <br />v. Respond to authorizing agencies questions <br />e. Agency Site Inspections: <br />i. Attend site inspections and visits from regulatory agencies (up to 10 <br />hours for coordination and site visits) <br />f. Project coordination during construction <br />J. Schaaf and Wheeler and team to review and comment on change orders if <br />requested by the City. <br />K. Schaaf and Wheeler to prepare of as-builts drawings based on contractor mark- <br />ups, and change orders. <br />a. Field surveys to support as-built drawings are not anticipated, and are <br />therefore not included in this scope of services; however, they can be <br />provided for an additional fee upon request from the City and a written <br />authorization. <br />Deliverables: electronic copy of the final as-built drawings and final closeout letters from <br />the structural and geotechnical engineers. Electronic copies of all correspondence and <br />submittal reviews. Electronic copies of all biological monitoring reporting and <br />submissions. <br />ATTY/AGR.2026.093/Schaaf & Wheeler Consulting Civil Engineers(Redwood Creek Bank Stabilization Near 707 Bradford) (Page 16 of 21)
The URL can be used to link to this page
Your browser does not support the video tag.