My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-01-25 clsd and regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-01-25 clsd and regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2010 11:54:06 AM
Creation date
1/28/2010 3:51:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/25/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.2A <br />Page 31 <br /> <br />the permanent removal of these recreational structures would constitute a significant impact on <br />recreational facilities at this location. <br /> <br />. Mitigation Measure REC-la: Notify Local Jurisdictions and Lease-Holders <br />. Mitigation Measure REC-l b: Restore Recreational Facilities to Pre-Construction <br />Condition <br /> <br />Impact REC-lc: The Project would physically degrade recreational facilities by removing <br />or damaging existing recreational facilities directly. <br /> <br />The proposed Project would affect play structures, paved play areas, and turf areas/ball fields at <br />James L. Bunker Elementary School; at least three play structures and several mature trees next <br />to the play structures would be removed to accommodate construction. Although Standard <br />Constroction Measure No. 10 would require the reseeding and repaving of this facility, the <br />SFPUC is not proposing to replace any recreational structures as part of its Project description. <br />Therefore, the pennanent removal of these recreational structures would constitute a significant <br />impact on recreational facilities at this location. <br /> <br />. Mitigation Measure REC-l a: Notify Local Jurisdictions and Lease-Holders <br />. Mitigation Measure REC-l b: Restore Recreational Facilities to Pre-Construction <br />Condition <br /> <br />Impact REC-2b: The Project would cause environmental impacts that would result in <br />deterioration of the quality of the recreational experience. <br /> <br />On the western side of the Bay, part of the Bay Tunnel would be constructed next to the <br />Ravenswood Open Space Preserve and the San Francisco Bay Trail. The Ravenswood tunnel <br />shaft would be situated between the parks and trails, and the tunnel itself would be constructed <br />entirely beneath the Bay. Therefore, Project construction, as proposed, would not remove or <br />disrupt the recreational facilities or access to such facilities within the Preserve. However, <br />because Project construction would be located approximately 600 feet from the closest potential <br />recreational activity, recreational experience at the Preserve could be impacted by Project <br />construction. III addition, construction noise could impact users of the San Francisco Bay Trail. <br />Any pile driving performed at the construction area, for example, would create a loud, repetitious <br />noise that could be annoying and distu.rbing. Therefore, construction noise could significantly <br />degrade the quality of the recreational experience at the Ravenswood Open Space Preserve and <br />San Francisco Bay Trail. <br /> <br />. Mitigation Measure REC 2: Advance Notification <br /> <br />Impact REC-ld: The Project would physically degrade recreational facilities by removing <br />or damaging existing recreational facUities directly. <br /> <br />.. ..1'hepipeline:would.bisecitiiideii:Park:llarkfacHities :wHhiii:the.i1ghi :otway ihaf would .be:.:.:.. . . <br />directly affected by construction would include a play structure and swings, grassland areas, <br />landscaping, fencing, and paving. Although Standard Construction Measure No. 10 would <br />require the regrading, reseeding, and repaving of this facility, the SFPUC is not proposing to' <br />replace any recreational structures as part of its Project proposal. Therefore, the permanent <br />removal of these recreational structures would constitute a significant impact on recreational <br />facilities at this location. <br /> <br />. Mitigation Measure REC-l a: Notify Local Jurisdictions and Lease-Holders <br />. Mitigation Measure REC-l b: Restore Recreational Facilities to Pre-Construction <br />Condition <br /> <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.