My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Biggs Cardosa Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Biggs Cardosa Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2010 4:41:06 PM
Creation date
4/20/2010 4:41:03 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Biggs Cardosa Associates, Inc
PROJECT NAME
Structural Engineering Proposal for Replacement of: Existing Redwwod Creek Channel at 1605/0609 Redwood Avenue
RMP File Number
304.5
Date
4/19/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Redwood City <br />February 26, 2010 <br />Page 2 of4 <br /> <br />· Conduct field visit of structure to conduct visual inspections, prepare photo logs of the <br />structure, observe visible evidence of structure condition! deterioration and prepare field <br />review reports. <br /> <br />· Conduct Topographic Surveys and Base Mapping (by BKF Engineers) <br />o Conduct topographic survey of creek area within the project limits <br />o Conduct utility company coordination to identify any existing utilities within the project <br />limits <br />o Prepare project base mapping including topographic mapping, control lines, boundary <br />easements and utilities <br /> <br />· Conduct Geotechnical Investigation (by Parikh Consultants) <br />o Obtain USA Clearances for conducting field exploration. City to provide an access <br />permit to the existing backyard of 1605 Valota <br />o Conduct Field Exploration consisting of one portable boring to a maximum depth of 30- <br />feet in the existing backyard of 1605 Valota <br />o Perform laboratory tests that may include moisture-density, unconfined compression <br />gradation, etc. on the representative soil samples <br />o Perform engineering analysis and develop design recommendations for the proposed wall <br />o Prepare Draft Geotechnical Letter Report outlining preliminary recommendations for the <br />waIl design including lateral capacities, earth pressures, pile recommendations, etc <br />o Prepare Final Geotechnical Report including design recommendations for the required <br />wall elements. <br />o Assist designer during final PS&E preparation as required. <br /> <br />· Prepare Type Selection Memorandum (35% submittal) including: <br />o Preparation of draft General Plan of recommended replacement! rehabilitation alternative <br />o Preparation of preliminary cost analysis <br />o Preparation of Type Selection recommendation <br />o Attend Type Selection meeting with City staff <br /> <br />Deliverables: <br />· Three (3) hardcopies and one electronic copy (PDF) of the Draft Geotechnical Letter <br />Report <br />· Three (3) hardcopies and one electronic copy (P DF) of the Final Geotechnical Report <br />· Three (3) hardcopies and one electronic copy (P DF) of the Type Selection Memorandum <br /> <br />Task 2: Prepare Plans.. Soecifications and Estimates: <br />· Prepare 90% PS&E Submittal (Unchecked Plans) <br />o Perform structural design calculations. <br />o Develop draft unchecked plans and details <br />o Prepare draft structural specifications <br />o Prepare unchecked quantities and cost estimate <br /> <br />a.G-~- <br />~ ~. ._-~_... <br /> <br />'0- = _, <br />
The URL can be used to link to this page
Your browser does not support the video tag.