My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Biggs Cardosa Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Biggs Cardosa Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2010 4:41:06 PM
Creation date
4/20/2010 4:41:03 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Biggs Cardosa Associates, Inc
PROJECT NAME
Structural Engineering Proposal for Replacement of: Existing Redwwod Creek Channel at 1605/0609 Redwood Avenue
RMP File Number
304.5
Date
4/19/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Redwood City <br />Febrwuy 26,20] 0 <br />Page 3 of4 <br /> <br />Deliverables: <br />· Three (3) hardcopies and one electronic copy (PDF) ofthefol/owing: <br />o Half-size plans (11x17) <br />o Draft structural Technical Specifications <br />o Engineer's Estimate of anticipated construction casts <br /> <br />. Prepare 100% PS&E Submittal (Final Plans) <br />o Perform internal quality assurance reviews by an independent design team of the 90% <br />plans, specifications and estimate <br />o Address 900/0 submittal review comments by independent quality control review, City, <br />and other governing agencies and finalize the plans, specifications and estimate. <br />o Submit 100% PS&E (Final Plans) <br /> <br />Deliverables: <br />· One (1) photo ready hardcopy and one electronic copy (PDF) afthe/ollowing: <br />o Full-size plans (22x34) <br />o Structural Technical Specifications <br />o Engineer IS Estimate of anticipated construction costs <br /> <br />Fee Basis <br /> <br />Biggs Cardosa Associates, Inc. proposes to provide the design scope of services outlined in this <br />proposal, for a fixed fee including expenses, of $45,318. <br />. Task 1: $27,306 <br />. Task 2: $18,012 <br /> <br />The above totals include $9505 for Parikh Consultants and $6,500 for BKF Engineers. <br /> <br />Assumptions <br /> <br />The following assumptions were made in preparing this scope of work: <br /> <br />1. Project data for review as swnmarized in Task 1 will be made available by the City at the <br />initiation of the project. City base mapping is assumed to include the top and bottom of <br />creek banks, property lines and any known utilities <br /> <br />2. Agency coordination, permits and access will be provided by the City. <br /> <br />3. Field review will be limited to visual inspection of the existing facilities. Materials <br />testing is not included in the current scope of work. If destructive or non-destructive <br />material testing is deemed necessary, it will be outlined in the recommendations included <br />in the assessment report. <br /> <br />S.-... S~ -.. <br />. - ~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.